4.5.9 Aligning the insulation and attaching the controller
❒ Hang the lower spacer plate on the rivets (1) between the insulating side panels
and attach with one thread forming screw (2) each
❒ Push the insulating side panels toward the rear until the borehole on the flaps cor‐
responds with the borehole on the side panels
❒ Secure the insulating side panels to the right and left at the flap on the boiler base
with thread forming screws
❒ Measure the diagonals and align the insulating side panels so that the two diago‐
nals are the same
➥ Adjust the position of the side panels if necessary
❒ Tighten the nuts on the two brackets of the insulating side panels at the top on the
boiler
❒ Position the control on top
4
Assembly
Installing the boiler
42
Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at
All manuals and user guides at all-guides.com