Table of contents
Qualification of assembly staff
Personal protective equipment for assembly staff
Qualification of operating staff
Protective equipment for operating staff
Chimney connection/chimney system
Removing the electrostatic precipitator system from the pallet
Recommended clearances in the boiler room
Adjusting the height of the ash container
Adapting the handle on the ash container
Fitting the flue gas temperature sensor
Adapting the electrostatic precipitator system (if required)
Modification of the ash container on the opposite side of the filter system
Removing the ash container and fittings
Removing the drive and fittings
Installing the drive and fittings on the opposite side
Installing the ash container and fittings on opposite side
Modification of the bypass flap drive on the opposite side
Installing the electrostatic precipitator system on Turbomat TM
Establishing the connection line to the boiler
Table of contents
2
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Содержание EF 250
Страница 41: ...10 Notes Notes 10 Installation and Operating Instructions EF 250 500 M2140120_en 41 ...
Страница 42: ...10 Notes 42 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 43: ...Notes 10 Installation and Operating Instructions EF 250 500 M2140120_en 43 ...