4
Installation
4.1 Transport
The device is packaged in accordance with HPE packaging guidelines,
which are defined by the Bundesverband Holzmittel, Paletten, Exportver-
packungen e.V. (German Federation for Wood Packaging, Pallets and
Export Packaging) and the Verein Deutscher Maschinenbauanstalten
(Association of German Engineering Companies).
The device is delivered on a transport pallet with a wooden cover. We
recommend using a forklift or pallet truck for transporting the packed
device.
DANGER!
Do not step under the transport pallet during transport.
WARNING!
Improper lifting can lead to personal injury or property
damage. The machine is only to be lifted with suitable
equipment and by qualified personnel.
The guarantee excludes all claims for damage due to improper transport.
4.2 Unpacking
CAUTION!
Crushing hazard!
Always lift with 2 persons!
n
Remove the screws which attach the lid to the wooden case.
n
Lift the lid off the transport crate.
n
Remove the accessories.
n
Compare the contents of the delivery with your order.
Installation
- 15 -
Содержание ANALYSETTE 18
Страница 4: ......
Страница 38: ...11 Safety logbook Date Maintenance Repair Name Signature Safety logbook 36 ...
Страница 39: ...Date Maintenance Repair Name Signature Safety logbook 37 ...
Страница 41: ......