![Friedrich Kuhl SQ06 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/friedrich/kuhl-sq06/kuhl-sq06_installation-and-operation-manual_2333184018.webp)
18
STEP 5.2.
through screw hole in the bottom center of sill channel using 1 sup-
plied
1
1
1
you may secure each curtain with an additional screw through the remaining screw hole, insuring each window curtain is secured
accommodate varying window types.
1
1 screw per curtain and install the appropriate security lock as recommended by window manufacturer.
SECTION A-A
A
A
SECURE CURTAINS
THROUGH REMAINING
HOLES USING EITHER 1/2"
SCREWS (ITEM E: BLUE
BAG) OR 1 1/4" SCREWS
(ITEM F: GREY BAG).
SHELL SUPPORT CHANNEL
WINDOW SASH
SLEEVE
SILL
CHANNEL
SECURE SILL CHANNEL
TO WINDOW STOOL
USING (1) 1 1/4" SCREW
(ITEM F: GREY BAG).
WINDOW STOOL
in the front of unit and out of the way when inserting it back into the sleeve.
19
STEP 5.3.
CAUTION
Excessive Weight Hazard
Use two or more people when
installing your air conditioner.
Failure to do so can result in
back or other injury.
Figure 18
Figure 19