
42
PB
INSTALLATION
Chassis Install
18
Chassis Installation
1.
Lift unit level and slide unit into wall sleeve until seal rests
firmly against front of wall sleeve.
Figure
2
2
SecuringUnit
3.
Place tabs over top rail.(1)Push inward at bottom until panel
snaps into place(2).
4.
Reinstall front panel.See Figure 23.
CAUTION
Excessive Weight Hazard
Use two or more people when installing
your air conditioner.
Failure to do so can result in back
or other injury.
NOTICE
POWER
SUPPLY
CORD
FRP02
2
2.
Locate the four supplied chassis mounting screws.Insert the
screws through the chassis mounting flange holes that are
aligned with the speed nuts in the wall sleeve.Tighten all four
screws(two per side).
Copper refrigerant tubes are NOT handles.
Do NOT use tubing to lift or move chassis.
To remove the front cover,pull the bottom end forward and lift it up to
clear the L bracket across the top of the chassis.
5.
Plug the cord(if applicable)into the appropriate receptacle.
Restore power to the unit.
Figure
2
3
Replacing
FrontPanel
1
2
FRP02
3
Содержание FRESHAIRE PVH09K3FA
Страница 98: ...98 WIRING DIAGRAMS Figure 801...