![FRIEDHELM LOH 3313.410 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/friedhelm-loh/3313-410/3313-410_assembly-and-operating-instructions-manual_2332659008.webp)
2 Safety instructions
2
8
Rittal Liquid Cooling Package
Leak test pursuant to Article 4 (leak checks)
The leak checks shall be carried out with the following
frequency, depending on the CO
2
equivalent quantities
of fluorinated greenhouse gases.
–
5 t – 50 t
at 12-month intervals, (or where a leakage
detection system is installed, at least every
24 months),
–
50 t – 500 t
at 6-month intervals, (or where a leakage
detection system is installed, at least every
12 months),
–
more than 500 t
at 3-month intervals, (or where a
leakage detection system is installed, at least every
6 months).
2.3.4
Chemicals – Climate Protection Ordinance
This Ordinance applies in addition to the aforementioned
Regulation (EC) No. 517/2014 of the European Parlia-
ment and of the Council of 16 April 2014.
2.4
RoHS compliance
The LCP DX fulfils the requirements of EU Directive
2011/65/EC on the Restriction of Use of Certain Hazard-
ous Substances in Electrical and Electronic Equipment
(RoHS) of 1 July 2011.
Note:
Corresponding information about the RoHS
Directive may be found on our website at
www.rittal.com/RoHS.
Содержание 3313.410
Страница 1: ...LCP Rack DX 12 LCP Inline DX 12 3313 410 420 3313 430 440 Assembly and operating instructions...
Страница 65: ...Rittal Liquid Cooling Package 65 16 Further technical information 16 Fig 66 Standard condenser facade mounting...
Страница 75: ...Rittal Liquid Cooling Package 75 Notes 18...