
P/N 450368-03 Rev. E
11
S
ECTION
6:
R
INSE
C
YCLE
1.
Before initiating the
RINSE CYCLE
, the operator must ensure that the GranuFlo Dissolution Unit II
Access Port Lid in place (do not fully secure) and the Main Transfer Ball Valve is in the CLOSED
position. Make sure the Water Supply Valve is OPEN ( Figure 1).
Figure 1
The
RINSE CYCLE
consists of two RINSE Operations. Press the Rinse START button. The Fill Indicator
Light will illuminate indicating the RINSE CYCLE has started and the GranuFlo Dissolution Unit II is in
FILL Operation (Figure 2). Lift the Access Lid and look into the tank to verify that the tank is filling.
.
Figure 2 Figure 3
2.
Once the 25 Gallon Level Sensor is reached, the process automatically
steps to RECIRCULATE Operation (Figure 3). The operation will run for a
twelve (12) minute period. During this operation, the Spray Ball and jets
shall operate in 3 minute intervals. With your safety glasses on, lift the
lid after the Spray Ball has stopped operating and ensure that the water
is level with 25 Gallon Level Sensor. Since the water will be swirling in
the tank it is okay for the level to be a little above the 25 Gallon Sensor, but you should ensure
that the level is not rising. During this time period, follow the procedure outlined on the following
page to inspect and clean the Spray Ball Ring if needed see Figure 4: Spray Ball Ring Inspection /
Cleaning Instructions.
CAUTION!
B
EFORE INITIATING THE RINSE CYCLE
,
THE
D
RAIN
H
OSE MUST BE PLACED ABOVE A SUITABLE DRAIN
.
A
LWAYS
L
EAVE
A
CCESS
P
ORT
L
ID IN PLACE UNLESS MANUAL INSTRUCTS OTHERWISE
.
CAUTION!
I
F A
G
RANU
F
LO
D
ISSOLUTION
U
NIT
II
IS FOUND TO BE STANDING FOR
4
OR MORE HOURS WITH TREATED WATER OR
WETTED WITH TREATED WATER
,
THEN A DISINFECTION CYCLE
(
SEE SECTION
8.3
S
ODIUM
H
YPOCHLORITE
(
BLEACH
)
DISINFECTION
,
PAGE
23),
MUST BE COMPLETED BEFORE THE DISSOLUTION CYCLE IS STARTED
.
I
MMEDIATELY AFTER A COMPLETED
R
INSE
C
YCLE
,
MAKE
A BATCH OF
D
RY
A
CID
P
RODUCT
.
D
O
N
OT
L
EAVE THE
G
RANU
F
LO
D
ISSOLUTION
U
NIT
II
WITH ONLY TREATED WATER OR WETTED
WITH ONLY TREATED WATER FOR
4
OR MORE HOURS SINCE THE
G
RANU
F
LO
D
ISSOLUTION
U
NIT
II
IS SUSCEPTIBLE TO BACTERIAL
GROWTH
.
CLOSE Main Transfer Ball Valve by
turning the handle Counter
Clockwise until it stops.
Access Port Lid
Jets
The Granuflo II
Dissolution
Unit will fill
to the 25
GALLON
LEVEL
SENSOR.
25-Gallon
Sensor
Spray Ball
Содержание GranuFlo 450368-03
Страница 2: ... PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ... PAGE INTENTIONALLY LEFT BLANK ...
Страница 6: ... PAGE INTENTIONALLY LEFT BLANK ...
Страница 39: ...P N 450368 03 Rev E 33 PAGE INTENTIONALLY LEFT BLANK ...
Страница 41: ...P N 450368 03 Rev E 35 PAGE INTENTIONALLY LEFT BLANK ...
Страница 48: ...42 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...P N 450368 03 Rev E 43 APPENDIX A DRY ACID MIXING INSTRUCTIONS ...
Страница 50: ...44 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 51: ...P N 450368 03 Rev E 45 ...
Страница 52: ...46 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 53: ...P N 450368 03 Rev E 47 ...
Страница 54: ...48 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 55: ...P N 450368 03 Rev E 49 ...
Страница 56: ...50 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 57: ...P N 450368 03 Rev E 51 ...
Страница 58: ...52 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 59: ...P N 450368 03 Rev E 53 Appendi x C Dry Acid Mixing Instructions ...
Страница 60: ...54 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 61: ...P N 450368 03 Rev E 55 ...
Страница 62: ...56 P N 450368 03 Rev E PAGE INTENTIONALLY LEFT BLANK ...
Страница 63: ...P N 450368 03 Rev E 57 ...
Страница 65: ...P N 450368 03 Rev E 59 PAGE INTENTIONALLY LEFT BLANK ...
Страница 67: ...P N 450368 03 Rev E 61 PAGE INTENTIONALLY LEFT BLANK ...