86
optima06.0_0090b_en.fm
In
ter
v
e
n
ti
on p
ro
c
e
dur
es
!
Unscrew the 2 cruciform screws (marker 4) holding the power supply shelf in place.
!
Disconnect the earth wire (marker 5) and the mains connector (marker 6).
!
Remove the power supply board.
Re-assembling
Carry out the dismantling procedure in reverse order to re-assemble the unit.
When closing the pump, ensure that the 2 cables connecting the power supply board
and the CPU board are positioned above the motor. In addition, check that the earth
wire is next to the metal support.
Incorrect positioning of one of these cables could result in a noise being heard when
the pump is in operation. (See photo in Procedure n°1.)
!
Carry out regular servicing checks. (See Quality Control Certificate.)
.
5
4
4
6
Содержание OPTIMA PT-VS-S
Страница 1: ...TECHNICAL MANUAL TECHNICAL MANUAL OPTIMA PT VS ST From Serial N 18180100 till ...
Страница 6: ...66 Optima_PT VS ST_enTDM fm ...
Страница 8: ...8 optima01_002b_en fm Presentation 1 2 Operation diagram ...
Страница 20: ...20 optima02_002b_en fm Description and operation ...
Страница 26: ...26 optima03 1_001b_en fm Description of the menus ...
Страница 28: ...28 optima03 3_001b_en fm Description of the menus ...
Страница 30: ...30 optima03 4_002b_en fm Description of the menus ...
Страница 32: ...32 optima04 1 2_001b_en fm Preventive maintenance ...
Страница 54: ...54 optima05 2_002a_en fm Troubleshooting ...
Страница 56: ...56 optima06 0_001a_en fm Intervention procedures ...
Страница 64: ...64 optima06 0_0020b_en fm Intervention procedures ...
Страница 68: ...68 optima06 0_0030b_en fm Intervention procedures ...
Страница 72: ...72 optima06 0_0040b_en fm Intervention procedures ...
Страница 76: ...76 optima06 0_0050b_en fm Intervention procedures ...
Страница 92: ...92 optima06 0_0110b_en fm Intervention procedures ...
Страница 100: ...100 optima08 1_002b_en fm Spare parts catalogue ...
Страница 104: ...104 optima08 3_001b_en fm Spare parts catalogue ...
Страница 105: ......