13
16.
Make sure that all parts of the strength equipment are properly tightened.
To protect the floor or carpet
from damage, place a mat under the strength equipment.
15. Note: This step requires the parts that you
removed in step 3.
Attach the Access Cover (41) to the Tower (1)
with the six M6 x 10mm Screws (59) and the six
M6 Large Washers (74);
start all the Screws,
and then tighten them.
15
14. Note: This step requires the parts that you
removed in step 4.
Attach the Tower Brace (8) to the Tower (1) with
the four M10 x 20mm Screws (62) and the four
M10 Washers (72);
start all the Screws, and
then tighten them.
62
8
1
72
72
74
59
41
1
59
74
59
74
74
59
59
74
59
74
14