INSTALLING THE UNIT
1. Inspecting the Supplied Equipment
The package includes the following items:
CRATE #1
a . The pre assembled Base Module two pump package with piping, pumps, wire whips, check valves, isolation valves, suction and discharge
headers, instrumentation, integral mounting frame, and drain valves . Two additional grooved connections are included to connect the
extension header with the Triplex package
b . A pre assembled Discharge Header End Cap with bladder tank and spare 1-1/4” port for use in air purging or installation of relief valve (not included)
c . A Suction Header End Cap
d . Control panel – wrapped separately to protect the electronics .
e . Accessories kit which includes (2) 3” Victaulic flex couplings, a 1-1/4” 304 stainless hex plug, and control mounting hardware .
CRATE #2 (QUAD PACKAGES ONLY)
a . QUAD UNITS – A pre assembled Two Pump Extension Module Package with piping, pumps, wire whips, check valves, isolation valves, suction
and discharge headers, instrumentation, integral mounting frame, and drain valves .
b . Accessory kit which includes (4) 3” Victaulic flex couplings for connecting the Base Module with the Extension Module and control mounting
hardware .
2. Location Selection and Mounting
The pump pack is heavy and may require additional technicians to support and move the unit during installation .
Use extreme caution in selecting an appropriate vertical surface to mount the unit and consult with a structural
professional to verify that the selected wall can safely support the weight of the unit .
Identify a suitable wall location for mounting the package . The Base Module and Extension Modules were designed to be hung on either framed or
brick/block walls which can accommodate a 500 pound hanging load . The frames have keyways to allow the package to be hung on lag screws . The
Base Module and Two Pump Extension Modules must each be hung on 8 screws with an upper and lower screw on both the left and right sides of each
manifold . The One Pump Extension Module requires 4 screws (an upper and lower required for each manifold) . If the site has a different wall assembly
than either of those two or if you are unsure about the load capabilities of the wall, consult a building professional for help in mounting this package .
Drill pilot holes for the screw locations, and install the lag screws leaving approximately ¼” space between the screw head and the wall as shown in
Figure 1 . See Figure 2 for lag screw pilot hole locations .
Figure 1
WARNING