FRÄNKISCHE SediPoint Скачать руководство пользователя страница 2

FRÄNKISCHE | IM MM SediPoint

2

1. Safety instructions

Staff responsible for installation, assembly, 

operation, maintenance and repair must 

have appropriate qualifi cations required 

for this kind of work. The operator is respon-

sible for organising in detail authority, 

responsibility and supervision of staff.

The operational safety of the system com-

ponents supplied is only guaranteed in 

case of proper installation and correct use. 

Technical threshold values must not be 

exceeded.

Observe the accident prevention  

regulations and relevant standards  

and directives for installation, fitting,  

operation, maintenance and repair!

This includes (in extracts):

n

  Accident prevention regulations

  - Construction work BGV C22  

(Bauarbeiten BGV C22)

  - Technical wastewater systems GUV-V 

C5 

(Abwassertechnische  

Anlagen GUV-V C5)

n

  Safety regulations for working in 

enclosed spaces of technical  

wastewater systems GUV-R 126  

(Sicherheitsregeln für Arbeiten in 

umschlossenen Räumen von 

abwasser technischen Anlagen GUV-R 

126)

n

  Handling biological working materials 

in technical wastewater systems 

GUV-R 145 

(Umgang mit biologischen 

Arbeitsstoffen in abwassertechnischen 

Anlagen GUV-R 145)

n

  Directives for working in tanks and nar-

row spaces BGR 117  

(Richtlinien für Arbeiten in Behältern  

und engen Räumen BGR 117)

n

  Standards

  -  Excavations and trenches – slopes, 

planking and strutting, breadths of 

working spaces DIN 4124 

(Baugruben 

und Gräben - Böschungen, Verbau, 

Arbeitsraumbreiten DIN 4124)

  - Construction and testing of drains and 

sewers DIN EN 1610 

(Einbau und Prü-

fung von Abwasserleitungen und 

-kanälen DIN EN 1610)

n

  Tool for safety and health protection in 

technical wastewater systems

ATTENTION

Non-compliance with the operating 

manual may result in considerable  

property damage, injury or death.

The system is part of an entire network. 

During installation, maintenance, service 

and repair work on one component, 

always consider the entire system. 

Avoid work during rain.

Changes or modifications to the system 

may only be carried out with the agree-

ment of the manufacturer. For safety 

reasons, use original spare parts and 

accessories approved by the manufacturer. 

The use of other parts may void the  

liability for any consequences arising 

therefrom.

n

  Hazards from gases and vapours 

such as risk of suffocation, risk of  

poisoning and risk of explosion

n

  Risk of falling

n

  Risk of drowning

n

  Germ pollution and wastewater with 

sewage

n

  High physical and psychic strain  

during work in deep, narrow and  

dark spaces

n

  And others

WARNING

DANGER

CAUTION

Содержание SediPoint

Страница 1: ...Installation and maintenance manual SediPoint sedimentation shaft DRAINAGE SYSTEMS ELECTRICAL SYSTEMS BUILDING TECHNOLOGY INDUSTRIAL PRODUCTS Last modified January 2020...

Страница 2: ...Directives for working in tanks and nar row spaces BGR 117 Richtlinien f r Arbeiten in Beh ltern und engen R umen BGR 117 n Standards Excavations and trenches slopes planking and strutting breadths o...

Страница 3: ...vating pit and creating bearing 8 4 3 Pre assembling the base shaft 8 4 4 Installing the base shaft 8 4 5 Embedding the pipe 12 4 6 Optional connection set 12 4 7 Tests before backfilling and impermea...

Страница 4: ...ional connection set 1 SediPoint 2a Sediment collector with flow separator 2b Immersion pipe 3 Integrated bypass incl backwater threshold 4 Inlet 5 Outlet 6 Mud chamber 7 Operating pipe with telescopi...

Страница 5: ...to 2 50 m n BARD ring class D concrete support ring environment and downstream stormwater management structures 2 00 Inlet DN OD 315 Inlet DN OD 200 1 02 1 57 1 49 2 51 3 06 0 34 0 30 Shaft cover 1 CW...

Страница 6: ...f spills with light liquids In case of spills in dry weather Floatables and light liquids Coarse particles Fine particles Coarse particles sediment in the mud chamber Fine particles sediment thanks to...

Страница 7: ...nd that they are protected from getting dirty The impact strength of the material decreases in sub zero temperatures The relevant safety provisions of the building industry apply Delivery includes Sed...

Страница 8: ...ben und Gr ben apply When installing the shaft comply with e g DIN EN 1610 Construction and testing of drains and sewers Einbau und Pr fung von Abwasserleitungen und kan len Create and compact the sha...

Страница 9: ...shaft with bayonet nut connector For better accessibility position the handle directly under the mud bucket Adjust the telescopic rod of the operating pipe if required with extension for large shaft...

Страница 10: ...secure it to prevent shifting Ensure upright alignment Mount cone with sealing ring on base shaft into the second corrugation trough use lubricant Mount cone with sealing ring on base shaft into the...

Страница 11: ...ss D concrete support ring can be used as an alter native to on site concrete support Generally both must be positioned 10 cm over the edge of the shaft or extension pipe Ensure load separation to the...

Страница 12: ...s compactable material Compact material layer by layer For structured wall pipe connections mount the sealing rings into the second corrugation trough Use lubricant The extension pipe DN 250 can be cu...

Страница 13: ...o avoid sta tionary loads between equalisation ring and shaft cover Create the bearing from compacted bearing layer material EV2 module 100 MN m or in situ concrete of at least C 16 20 Avoid connectio...

Страница 14: ...joint between the bearing and extension pipe The bearing surface for the frame must be even The frame of the shaft cover must rest on the bearing with its entire contact area If the cover is outside...

Страница 15: ...ecialist Alternatively cleaning can be performed using a high pressure cleaner and a wastewater pump The maximum out side diameter of the pump must not exceed 170 mm For disposal of a Remove the shaft...

Страница 16: ...t the same time drain the flushing water To do so clean the depots and flow separators through the cleaning shaft of the sediment collector 1 Insert the operating pipe 2 Close the bayonet nut connecto...

Страница 17: ...ning is required the sediment collector can be removed using a winch or tripod When using the optional connection set you can determine the degree of pollution of the inlet through the open cover The...

Страница 18: ...ation techniques are applied these must be agreed upon with FR NKISCHE since these situations or techniques may lead to different conclusions Notwithstanding the above the customer is solely responsib...

Страница 19: ...chtscheidel fraenkische de International Sales European Sales Technology Dinah Nigrowics 49 9525 88 8155 dinah nigrowics fraenkische de Stefan Wei 49 9525 88 8824 stefan weiss fraenkische de Jennifer...

Страница 20: ...00 people worldwide Both our many years of experience and expertise in plastics pro cessing our consulting services and the large array of products are highly valued by our customers FR NKISCHE is a t...

Отзывы: