![FRÄNKISCHE SediPoint Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/frankische/sedipoint/sedipoint_installation-and-maintenance-manual_2328166012.webp)
FRÄNKISCHE | IM MM SediPoint
12
4. Installation
4.5 Embedding the pipe
4.6 Optional: connection set
Country-specific regulations must be
observed. DIN EN 1610 forms the basis
for the entire installation.
Create embedding and side filling
with stoneless, compactable material.
Compact material layer by layer.
For structured-wall pipe connections,
mount the sealing rings into the second
corrugation trough. Use lubricant. The
extension pipe DN 250 can be cut to
length, if required (see Section 4.4).
Example SediPoint outlet height 1.02 – 1.57
Cl. D shaft cover
Inlet
Inlet
SediPoint connection set
Cl. D shaft cover
CW 300
CW 610, with ventilation
openings and dirt trap acc. to
DIN 1221 (to be supplied on site)