background image

 

 

 

 

EN 

 

1
0

 

10 

Hood body installation 

•  Before hooking the hood body it is necessary to tighten 2 Vr  screws 

placed in the fixing points of the body. 

•  Hook the hood body on the 12a screws.  
• Tighten 

completely 

12a support screws. 

•  The correct hood body position can be levelled with Vr screws. 
•  Fix the hood definitively by tightening the 12a security screw. 

 

12a

Vr

Connections 

DUCTED VERSION AIR EXHAUST SYSTEM 

When installing the ducted version, connect the hood to the 
chimney using either a flexible or rigid pipe ø 150 or 120 mm, 
the choice of which is left to the installer. 
•  To install a ø 120 mm air exhaust connection, insert the re-

ducer flange 9 on the hood body outlet. 

•  Fix the pipe in position using sufficient pipe clamps (not sup-

plied). 

•  Remove any activated charcoal filters. 

 

9

ø 120

ø 150

RECIRCULATION VERSION AIR OUTLET 

•  Insert the connection extension pieces laterally 14.1 in connec-

tion 15. 

•  Insert the Connector 15 into the Support bracket 7.3 and fix it 

with a screw. 

•  Make sure that the outlet of the extension pieces 14.1 is hori-

zontally and vertically aligned with the chimney outlets.  

•  Connect the air outlet connection 15 to the hood body outlet 

using either a flexible or rigid pipe   ø 150 mm, the choice of 
which is left to the installer. 

•   Ensure that the activated charcoal filters have been inserted. 

 

ø 150

15

14.1

7.3

Содержание FNES 907 BTH XS/GLASS

Страница 1: ...lation Cooker Hood Istruzioni per l uso e l installazione Cappa Mode d emploi et installation Hotte de Cuisine Bedienungsanleitung und Einrichtung Dunstabzugshaube Kullan m ve montaj talimatlar Davlum...

Страница 2: ...EN 2 2 Instructions Manual INDEX RECOMMENDATIONS AND SUGGESTIONS 7 CHARACTERISTICS 8 INSTALLATION 9 USE 12 MAINTENANCE 13...

Страница 3: ...naked flames under the hood when it is in operation Adjust the flame intensity to direct it onto the bottom of the pan only making sure that it does not engulf the sides Deep fat fryers must be contin...

Страница 4: ...2 2 1 Lower Section 9 1 Reducer Flange 150 120 mm 14 1 2 Air Outlet Connection Extension 15 1 Air Outlet Connection Ref Q ty Installation Components 7 2 1 2 Upper Chimney Section Fixing Brackets 7 3...

Страница 5: ...per chimney section supplied aligning the centre notch with the vertical line Mark the wall at the centres of the holes in the bracket Mark a reference point as indicated at 116 mm from the vertical r...

Страница 6: ...staller To install a 120 mm air exhaust connection insert the re ducer flange 9 on the hood body outlet Fix the pipe in position using sufficient pipe clamps not sup plied Remove any activated charcoa...

Страница 7: ...widen the two sides of the upper flue and hook them behind the brackets 7 2 1 making sure that they are well seated Secure the sides to the brackets using the 4 screws 12c 2 9 x 9 5 supplied Make sure...

Страница 8: ...he Fans turn off and the carriage returns After this the 24H function starts Starts the Motor at a speed that allows suction of 100 m3 h for 10 minutes per hour for 24h after which the Motor will stop...

Страница 9: ...and need to be cleaned whenever the FF sign appears on the display or at least once every 2 months use or more frequently if use is particularly intensive Resetting the alarm signal Turn the Lights a...

Страница 10: ...ter saturation alarm DEACTIVATED CHANGING THE ACTIVATED CHARCOAL FILTER Resetting the alarm signal Turn the Lights and the Suction motor off then disable the 24h func tion if enabled Press button E un...

Страница 11: ...436004063_ver2 Franke S p a Via Pignolini 2 37019 Peschiera del Garda VR www franke it...

Отзывы: