
Framery Q (UL) Meeting Maggie
2.
From inside the pod, feed the DC extension cord into the electric pipe in the roof and
down to the opening in the floor.
3.
At the opening, guide the DC extension cord into the electric pipe in the floor. Feed the
cord through the opening in the center joint.
80
Installation instructions
Содержание Q
Страница 1: ...Framery Q UL Meeting Maggie Installation instructions English Version 5 0 Tampere Finland 21 6 2022 ...
Страница 2: ......
Страница 6: ...Framery Q UL Meeting Maggie ...
Страница 146: ...Framery Q UL Meeting Maggie 146 Installation instructions info frameryacoustics com ...
Страница 147: ...Framery Q UL Meeting Maggie ...
Страница 148: ...Framery Q UL Meeting Maggie Installation instructions Patamäenkatu 7 33900 Tampere FINLAND VAT FI 23527139 ...