
3.
Guide the other edge of the left-hand bottom body cover into the groove at the lower
part of the left-hand wall.
4.
Slide the right-hand bottom body cover under the pod.
Guide the edge of the cover into the groove under the floor.
Note:
If you installed the power cord to the floor, make sure that you install the
bottom body cover with the rubber lead-through on the side of the power cord.
Framery Q Working with PAL Installation instructions
[email protected]
95
Содержание Q Working with PAL
Страница 1: ...Framery Q Working with PAL Installation instructions English Version 2 1 ...
Страница 2: ......
Страница 104: ...104 Framery Q Working with PAL Installation instructions info frameryacoustics com ...
Страница 105: ......
Страница 106: ...Framery Q Working with PAL Installation instructions Patamäenkatu 7 33900 Tampere FINLAND VAT FI 23527139 ...