
2.
Feed the LAN cords one at a time along the electrical pipe to the center of the floor.
If you feed the LAN cords from the left-hand side of the pod, feed them through the
opening in the center joint to the right-hand side of the floor.
10.4 Install the power unit
1.
Make sure that the ON/OFF switch of the power unit is in the "I" position.
60
Framery Q Working with PAL Installation instructions
Содержание Q Working with PAL
Страница 1: ...Framery Q Working with PAL Installation instructions English Version 2 1 ...
Страница 2: ......
Страница 104: ...104 Framery Q Working with PAL Installation instructions info frameryacoustics com ...
Страница 105: ......
Страница 106: ...Framery Q Working with PAL Installation instructions Patamäenkatu 7 33900 Tampere FINLAND VAT FI 23527139 ...