
4 Floor
4.1 Connect the floor modules
1.
Lay the floor modules down at the intended final location.
Leave approximately 0.5 m (2 ft) of empty space behind the floor modules.
Note:
If reinstalling the pod after relocation, there may be some scratches on
the black ABS strips. Make sure that the scratched sides are on the intended
front of the pod.
Note:
Make sure that the half-sized acoustic panel is at the intended back of
the pod.
Framery Q Working with PAL Installation instructions
[email protected]
11
Содержание Q Working with PAL
Страница 1: ...Framery Q Working with PAL Installation instructions English Version 2 1 ...
Страница 2: ......
Страница 104: ...104 Framery Q Working with PAL Installation instructions info frameryacoustics com ...
Страница 105: ......
Страница 106: ...Framery Q Working with PAL Installation instructions Patamäenkatu 7 33900 Tampere FINLAND VAT FI 23527139 ...