2. PRE-INSTALLATION
The following is required to ensure that the site is ready for
installation and that all materials are included.
NOTICE
Make sure that the site is ready and the
PowerSewer® is undamaged and complete before disconnecting an
existing sewage system or connection
2.1 PowerSewer® Inspection
The packing materials for your PowerSewer® grinder pump pressure
sewer system are specially designed to prevent shipping damage.
As a precaution, the system should remain in the packaging until
you are ready to install it. When you are ready to install the system,
remove the packaging materials. Examine the equipment for any
hidden damage that may have occurred during shipping. If damage
has occurred, handle all claims with the shipper.
NOTICE
If the collection tank or other PowerSewer®
component is suspected of being damaged, installation should be
suspended until the extent of the damage can be determined by
an authorized Franklin Electric representative Any field repairs or
alterations must be authorized in writing by Franklin Electric and then
performed in accordance with Franklin Electric written instructions
2.2 Verify Site Readiness
The PowerSewer® grinder pump pressure sewer system is shipped
ready for immediate installation and operation. To facilitate and speed
installation, make sure that the site is prepared. Site preparation
requirements include:
• Location of collection tank, piping, and accessory
installations identified
• Suitable excavation equipment
• Rounded aggregate for collection tank foundation
• Concrete for collection tank ballast (minimum 7 cubic feet)
• Approved backfill materials (see section 10.1, Approved
Backfill Materials)
• Determine main electrical supply power and make sure pump
and panel are compatible
• 20/30 Amp, circuit breaker for the main electrical supply power
(refer to pump rating for electrical requirements)
• Inlet piping and fittings, 4" Schedule 40 PVC
• Discharge piping, 1-1/4" Schedule 40 or SDR 21 PVC or SDR 11 PE3408
• Vent piping and fittings, 2" Schedule 40 PVC
• 12-gauge, 3-conductor with ground, direct bury cable
supplied by installer
• 18-gauge, 6-conductor, direct bury cable
supplied by installer
• 18-gauge 3-conductor direct bury cable for IGPDS-M
supplied
by installer
.
WARNING
Hazardous voltage can shock, burn or
cause death Verify required electrical supply power for specific
grinder pump Using the incorrect voltage or phase can cause fire or
damage to the pump motor or cause sever personal injury and will
immediately void the warranty
2.3 General Installation Steps
The following installation steps are an outline of the detailed
installation requirements:
1. Excavate for collection tank, inlet piping, electrical cables
and discharge piping
2. Set and ballast collection tank
3. Install inlet, vent, and discharge piping
4. Run electrical cabling between property
service panel, control panel
5. Bolt cover on
6. Backfill collection tank, piping, and electrical cables
7. Install pump
8. Make wiring connections
9. Turn system on and test
NOTICE
Failure to install this product according to the
instructions and warnings found in this manual will void all warranties
associated with this product and may result in serious injury or death