![FP centormail Скачать руководство пользователя страница 185](http://html1.mh-extra.com/html/fp/centormail/centormail_operators-manual_2325853185.webp)
Appendix – Moving the centormail mailing system to another location
185
Installation of the weighing platform
• Hold the weighing platform in a way
that
– the higher side of its base faces for-
ward and
– the weighing tray is even.
• Place the weighing platform from
above, so that its four hollow shafts
cover the four pegs of the scale.
• Gently push down the weighing plat-
form, applying constant pressure.
Insert cables
Connection cable
(postage meter – dynamic scale)
Power cable
Power cable
Modem cable
Connection cable
(dynamic scale – sealer)
Termination plug
Power cable
Connection cable
(sealer – feeder)
Power supply unit
Содержание centormail
Страница 1: ...centormail Digital Mailing System Operator Manual ...
Страница 162: ...centormail Operator Manual 162 ...
Страница 165: ...Appendix Menu overview 165 Menu overview Subject to modifications ...
Страница 194: ...centormail Operator Manual 194 Equipment Subject to short term modification ...
Страница 212: ...51 0038 3115 00 Rev 01 ECN 07 1134 2007 05 50 helbig berlin ...