background image

Access to the second level

 

 

To access the parameters the controller must be in the stand-by mode. 

 

To place the controller in ‘stand–by’ press 

for 2 seconds, whilst in stand-by the cabinet internal air 

temperature will be displayed intermittently. 

 

Press 

and 

for 4 seconds the display will show ‘

PA

’. 

 

Press ‘

0

’ will be displayed, press 

to change the setting to ‘

-19

’  

 

Press ‘

PA

’ will be displayed.   

 
Press 

and 

for 4 seconds the display will show ‘

CA1

’ the first parameter in the second level. 

 
Press 

to display the value followed by 

to decrease the value or 

to increase the value.   

 
Press 

to return to the followed by 

to move to the next parameter. 

 
On completion of the changes press 

plus 

to exit or wait 60 seconds   

 

Second Level Configuration Parameters 

Mnem. 

Definition 

Min. 

Max 

Default 

Dim. 

Default

CA1 

Air probe offset 

-25 

25 

°K 

CA2 

Food probe offset 

-25 

25 

°K 

P0 

Probe type (0 = PTC, 1 = NTC) 

flag 

P1 

Decimal point active (0 = No, 1 = Yes) 

flag 

P2 

Temperature unit (0 = 

o

C, 1 = 

o

F) 0 

flag 

P3 

Food probe activation (0 = No, 1 = Yes) 

flag 

r0 

Differential of parameters r7, r8, r9 and rA 

0.1 

15.0 

2.0 

°K 

2.0 

r1 

Timed positive blast chilling duration 

600 

90 

min. 

90 

r2 

Timed negative blast chilling duration 

600 

240 

min. 

240 

r3 

Positive blast chill end point temperature (food probe) 

-99.0 99.0  3.0 

°C 

3.0 

r4 

Negative blast chill end point temperature (food probe) 

-99.0 

99.0 -18.0 °C -18.0 

r5 

Set temperature positive blast chilling duration 

600 

90 

min. 

90 

r6 

Set temperature negative blast chilling duration 

600 

240 

min. 

240 

r7 

Positive blast chilling setpoint (air temp.) 

-99.0 

99.0 

0.0 

°C 

0.0 

r8 

Negative blast chilling setpoint (air 

temp.) 

-99.0 

99.0 -40.0 °C -25.0 

r9 

Post positive blast chilling storage setpoint 

-99.0 99.0  2.0 

°C 

2.0 

rA 

Post negative blast chilling storage setpoint -99.0 

99.0 

-20.0 °C -20.0 

rb 

Negative blast chilling and storage enabling 

0 (NO) 

(YES) 

1 flag 0 

rc 

Test for food probe insertion differential (0 = no test) 

0.0 

99.0 

°K 

rd 

Duration of probe insertion test 

99 

60 

sec. 

60 

C0 

Compressor start delay 

240 

min. 

C1 

Compressor interval between starts 

240 

min. 

C2 

Minimum compressor shut down time 

240 

min. 

C3 

Minimum compressor run time 

240 

sec. 

C4 

Compressor shut down with air probe error in hold (if 'C11' = 0) 

240 

10 

min. 

10 

C5 

Compressor shut down with air probe error in positive chill cycle 
(if 'C11' = 0) 

0  240  10 min. 10 

C6 

Compressor shut down with air probe error in negative chill cycle 
(if 'C11' = 0) 

0  240  20 min. 20 

C11 

Food probe operation with air probe failure 

flag 

 

5

 

Содержание FX Blast Chiller

Страница 1: ...FX BLAST CHILLER ISO 14001 ISO 9001 ...

Страница 2: ...it in such a way as to prevent its escape into the environment harm to human health and to ensure the compliance with the environmental law Guidance is available from the Environment Agency on how to comply with the waste management duty of care 3 The following waste must be stored of separately from other wastes as they are hazardous to the environment refrigerants polyurethane foam oils 4 When a...

Страница 3: ...es FXBC 40 Blast Chiller 40kg capacity with twelve GN1 1 shelves Controller Description The controller is mains voltage 230 50 60 1 00 555941 Timed Chilling LED Set Temperature Chilling LED Storage LED Alarm LED Degree Celsius LED The device has the following operational states ON the controller is switched on and an operating cycle is running stand by the controller is switched on but no operatin...

Страница 4: ...time settings on completion of the programme the time will revert back to the default setting of 90 minutes Temperature chill operation Place the controller in stand by pressing for 2 seconds Ensure that the food probe is inserted into the product prior to commencing the temperature chill programme 3 Press PoS will be displayed and the Timed Chilling LED may be flashing if it is Press again to dis...

Страница 5: ...y to decrease the value or to increase the value Press to return to the followed by to move to the next parameter On completion of the changes press plus to exit or wait 60 seconds First Level Configuration Parameters Mnem Definition Min Max Default Dim FXBC r0 Parameter r7 r8 r9 and Ra hysteresis 0 1 15 0 2 0 K 2 0 r1 Timed positive blast chilling duration 1 600 90 min 90 r2 Timed negative blast ...

Страница 6: ... 90 r2 Timed negative blast chilling duration 1 600 240 min 240 r3 Positive blast chill end point temperature food probe 99 0 99 0 3 0 C 3 0 r4 Negative blast chill end point temperature food probe 99 0 99 0 18 0 C 18 0 r5 Set temperature positive blast chilling duration 1 600 90 min 90 r6 Set temperature negative blast chilling duration 1 600 240 min 240 r7 Positive blast chilling setpoint air te...

Страница 7: ...operation 0 Output a 1 output b 2 comp protection 0 2 1 flag 0 i1 Digital input contact type 0 NO 1 NC 2 no input 0 2 2 flag 1 i2 Digital input alarm delay only if i0 0 or 1 1 no alarm sound 1 120 30 min 30 i3 Digital input effect duration only if i0 0 or 1 1 until input disabled 1 120 15 min 1 i7 Compressor protection deactivation delay only if i0 2 0 120 0 min 0 u0 Relay K2 operation 0 defrostin...

Страница 8: ... Evaporator Coil Coil 013584 00 555412 FXBC10 Evaporator Coil Coil 013524 00 555410 FXBC20 Evaporator Coil Coil 013475 00 555408 FXBC30 FXBC40 Evaporator Fan Motor 00 555374 FXBC10 Evaporator Fan Motor 00 555375 FXBC20 FXBC30 FXBC40 Expansion Valve Body TES2 N 68Z3417 68 15450385 All Models Orifice 00 68 20900 68 207 15451102 FXBC10 FXBC20 Orifice 02 68 2092 68 2072 15451104 FXBC30 FXBC40 Expansio...

Страница 9: ...FXBC 10 Wiring Diagram 8 ...

Страница 10: ...FXBC 10R Wiring Diagram 9 ...

Страница 11: ...FXBC 20R Wiring Diagram 10 ...

Страница 12: ...FXBC 20R Wiring Diagram 11 ...

Страница 13: ...FXBC 30 Wiring Diagram 12 ...

Страница 14: ...13 FXBC 30R Wiring Diagram ...

Страница 15: ...FXBC 40 Wiring Diagram 14 ...

Страница 16: ...FXBC 40R Wiring Diagram 15 ...

Страница 17: ...16 ...

Страница 18: ...17 ...

Страница 19: ...18 ...

Страница 20: ...erfrance com F F T E Germany oster Refrigerator Gmbh el 49 7819907840 Fax 49 7819907844 mail info foster gmbh de F T E Foster Refrigerator ldmedow Road ings Lynn orfolk E30 4JU el 01553 691122 ax 01553 691447 ebsite www fosterrefrigerator co uk O K N P T F W Email sales foster uk com a Division of ITW UK Ltd XBC SM 06 07 F 19 ...

Отзывы: