4.4
Installations procedure VES-SBE-1250
Installation Procedure
1. Picking up a RRT or pipe with an external upset.
2. Transport the Bushing Assembly by using the
ringbolts on the lifting assembly.
3. Unscrew the screws and washers from
the lifting plate.
4. Screw a ringbolts into the bushing segment.
5. Lift the SBE over the RRT. Lower the RRT from the
bottom through the SBE. A previous disassemble is not
necessary.
Fig. 22: Step I
Fig. 23: Step II
Fig. 24: Step III
Operation Maintenance Manual
Solid Body Elevator
PN 691250-Z-BC-D - Revision: 04 07-2018
22
O
PE
R
A
TION