4.3
Installations procedure SBE-1250
Installation Procedure
1. Pick up a RRT or pipe with an external upset.
2. Disassemble the RRT and lower it from the top
through the SBE.
3. Place the load shoulder of the RRT
on the top of the SBE, assemble the RRT.
4. SBE is now ready for operation.
Removal Procedure
1. Perform Step 4 to 2 in reversed order.
Fig. 20: Step I
Fig. 21: Step II
Operation Maintenance Manual
07-2018
PN 691250-Z-BC-D - Revision: 04
Solid Body Elevator
21
O
PE
R
A
TION