3
INSPIRE RAILING INSTALLATION
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits. The deck and railing installer should determine
and implement appropriate installation techniques for each
installation situation. Fortress Building Products and
its distributors shall not be held liable for improper or unsafe
installations.
Fortress Posts must always be secured to the deck
framing and should never be attached to only the deck
boards.
Note
When cutting Inspire Railing, it is very important to
complete the following at cut points:
• Remove all metal shavings from the cut area.
• File any sharp edges left by cutting. Thoroughly
wipe and remove any filings, grime or dirt from the
railing.
• Apply two coats of Fortress zinc based touch-up
paint to the cut area. If touch up is at rail ends,
allow paint to dry before connecting bracket to
post.
• Be sure to remove any metal shavings from the
surface of deck, patio or balcony to prevent stains
on the deck surface.
Torx Safety Tips
• Always use the lowest speed setting on drill.
• To reduce chance of bit breakage, start tightening with drill
on low torque setting and work up until screw is secured.
Tip: Pre-drill holes with 3/16” [5mm] drill bit.