![Fortress Building Products FortressAccents Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/fortress-building-products/fortressaccents/fortressaccents_installation-instructions-manual_2322382004.webp)
4
FORTRESSACCENTS INSTALLATION: PLUG AND PLAY
Required Materials
Goggles
Tape
Measure
Phillips Head
Screwdriver
Drill
T-25
Driver Bit
Drill Bits:
1/16” [2mm], 1/8” [3mm],
5/32” [4mm], 1/2” [13mm]
Pencil
Forstner Bit:
1” [25mm]
Rubber
Mallet
Light Option
LED Cap Light
Fish
Tape
Cable
Clip
Light Projection
LED Glow Ring
Recommended Install Position
The LED Glow Ring is
recommended to be installed
between the Post Cap and Post
Cap Base.
The LED Cap Light is
recommended to be installed
face down inside the slot holes
in the Post Cap Base.
The LED Vertical Post Light is
recommended to be installed
onto vertical surfaces.
The LED Surface Mount Light is
recommended to be installed
on the deck surface, soffits, or
stair risers.
Lighting
LED Vertical
Post Light
LED Surface
Mount Light
Содержание FortressAccents
Страница 1: ...1 FORTRESSACCENTS INSTALLATION PLUG AND PLAY FORTRESSACCENTS PLUG AND PLAY INSTALLATION INSTRUCTIONS...
Страница 7: ...7 FORTRESSACCENTS INSTALLATION PLUG AND PLAY...
Страница 28: ...28 FORTRESSACCENTS INSTALLATION PLUG AND PLAY Fig 63 Fig 64 Fig 65 Fig 66...
Страница 30: ...30 FORTRESSACCENTS INSTALLATION PLUG AND PLAY Fig 68 Fig 69 Fig 70...