background image

JSC

 

“Forteza”

 

 

“Forteza

 

Tribo

M”

 

operation

 

manual

 

11

 

 

5.

 

Installation

 

and

 

preparation

 

for

 

use

 

5.1.

 

General

  

Be

 

sure

 

to

 

observe

 

all

 

norms

 

and

 

regulations

 

for

 

assembling

 

and

 

wiring

 

work

 

in

 

the

 

guard

 

alarm

 

installation.

  

The

 

guard

 

alarm

 

being

 

powered

 

from

 

the

 

remote

 

power

 

source,

 

select

 

the

 

type

 

of

 

wire

 

and

 

the

 

conductor

 

cross

section

 

so

 

that

 

the

 

voltage

 

across

 

the

 

SPU

 

terminals

 

is

 

from

 

9

 

to

 

36

 

V

 

with

 

the

 

output

 

power

 

supply

 

voltage

 

changing

 

within

 

permissible

 

limits.

  

 

IMPORTANT.

 

To

 

ensure

 

the

 

guard

 

alarm

 

trouble

free

 

operation

 

provision

 

should

 

be

 

made

 

for

 

the

 

standby

 

DC

 

power

 

supply

 

 

 

Use

 

non

sensitive

 

cable

 

to

 

connect

 

the

 

sensor

 

to

 

the

 

signal

processing

 

unit.

  

Make

 

sure

 

non

sensitive

 

cable

 

is

 

hidden

 

and

 

the

 

possibility

 

of

 

its

 

damage

 

is

 

eliminated

 

when

 

laying

 

the

 

cable

 

from

 

the

 

signal

processing

 

unit

 

to

 

the

 

sensor

 

end.

  

5.2.

 

SPU

 

Installation

  

In

 

equipping

 

the

 

perimeter

 

fences

 

it

 

is

 

a

 

good

 

practice

 

to

 

install

 

the

 

signal

processing

 

unit

 

in

 

the

 

metal

 

splash

proof

 

cabinet

 

to

 

improve

 

the

 

guard

 

alarm

 

sabotage

 

resistance

 

and

 

to

 

allow

 

for

 

the

 

additional

 

equipment

 

location

 

(an

 

alarm

 

button,

 

a

 

network

 

controller

 

of

 

the

 

data

 

acquisition

 

and

 

processing

 

system,

 

etc).

 

Be

 

sure

 

to

 

locate

 

the

 

cabinet

 

and

 

the

 

signal

processing

 

unit

 

in

 

it

 

so

 

that

 

the

 

connecting

 

cables

 

of

 

the

 

sensor,

 

alarm

 

stub,

 

remote

monitoring

 

stub

 

and

 

power

 

leads

 

are

 

conveniently

 

connected

 

and

 

the

 

possibility

 

of

 

SPU

 

periodic

 

inspection

 

and

 

adjustment

 

is

 

provided.

  

Prior

 

to

 

the

 

SPU

 

installation,

 

do

 

holes

 

layout

 

work

 

for

 

the

 

SPU

 

fastening

 

and

 

fasten

 

it

 

with

 

screws

 

and

 

screw

 

nails.

  

The

 

following

 

equipment

 

is

 

to

 

be

 

connected

 

to

 

the

 

signal

processing

 

unit:

  

 

ground

 

bus

 

(uninsulated

 

copper

 

wire

 

of

 

cross

section

 

1.0

 

mm

2

 

,

 

minimum);

  

 

sensor

 

connected

 

by

 

means

 

of

 

connecting

 

cable;

  

 

alarm

 

stub;

  

 

remote

monitoring

 

stub;

  

 

supply

 

line.

  

 

CAUTION. 

 

Be sure to ground the guard alarm only at one point - by a fastener on the SPU case. 

 

In mounting the connecting cable, sensor and terminal unit, be sure to eliminate the possibility of 
grounding at other points of electric circuit. 

 

In connecting alarm and remote-monitoring stubs, MAKE SURE they are de-energized. 

 

Check the conductors’ polarity in connecting the supply line. 

 

 
 
 

Содержание TRIBO-M

Страница 1: ...TRIBOELECTRIC GUARD ALARM FOR PERIMETER AREAS FORTEZA TRIBO M Operation manual 2010 ...

Страница 2: ...gid Continuous Fences Fig 2 9 3 1 7 Gate Wicket Fig 3 9 4 Serviceability check 10 4 1 Safety Precautions 10 4 2 Serviceability Check 10 5 Installation and preparation for use 11 5 1 General 11 5 2 SPU Installation 11 5 3 Sensor Laying 12 5 4 Splicing the Ends of the Tribocable and Connecting Cable 12 5 5 Cables Termination in Adapter Fig 8 13 5 5 1 To terminate the cables in the adapter proceed as...

Страница 3: ...ature from 5 С to 40 С and relative air humidity up to 80 at 25 С 18 8 3 The storehouse rooms should be free of dust and vapour of corroding agents 18 8 4 Guard alarms may be transported at an ambient temperature from minus 40 С to 50 С and relative air humidity up to 100 at 25 С In transportation be sure to protect them against direct exposure to precipitation and dust 18 8 5 Guard alarms in stan...

Страница 4: ...ures the monitoring of the sensor integrity the cable of triboelectric effect the connecting cable being checked as well On their damage short circuit or broken cable the guard alarm system generates an alarm signal on the fault 1 2 Operating conditions The guard alarm system is intended for continuous round the clock operation Its performance is maintained within the set normal values The guard a...

Страница 5: ... people from 3 to 5 men and big animals Distance to the guarded zone 0 5 m Driving of wheeled full track and electric battery vehicles Distance to the guarded zone 1 5 m Railway freight and passenger transport Distance to the guarded zone 15 m Power lines up to 500kV Distance to the guarded zone 5 m Exposure to the radar electromagnetic field Is not regulated with a signal processing unit installe...

Страница 6: ...e Alarm mod Minimal length of the sensor to be connected tribocable comes to 1 2 m Maximal length of the tribocable to be connected does not exceed 1000 m 4 zones each 250 m Maximal area of detection zone enclosed area depends on the fence type and the way of the sensor laying 1 4 Standard equipment The following equipment is included in the guard alarm delivery set signal processing unit adapter ...

Страница 7: ...on SPU is designed in the metal case Located inside the case is an electronic board arranged around which are in circuit elements of the signal processing unit RS485 connection terminals for the external circuits connection and the guard alarm controls Provided on the SPU case are fasteners meant for its installation 2 1 3 Adapter and Coupling The adapter is meant for connecting the sensor togethe...

Страница 8: ...ire of rust resistant steel bimetallic wire reinforced barbed tape etc The sensor is mounted directly on the fence flexible elements The supports enabling a violator to get over the fence without touching its flexible elements being available the sensor is mounted on the supports as well The Alarm signal is generated on the flexible fence under local deformation of the fence and the sensor fastene...

Страница 9: ...be sure to lay the sensor according to the diagram with stress centers on every bar Fig 2 а To equip rigid fence of wooden materials solid metal plates and corrugated plates be sure to lay the sensor according to the diagram stress centers being made with clamps Figs 2b and 2c Note The stiffener being available at the top of the fence be sure to lay the sensor along this stiffener as well To equip...

Страница 10: ...nd maintenance Make sure the measuring instruments switched into the AC circuit are reliably grounded 4 2 Serviceability Check The guard alarm is to be inspected for external defects on its receipt from the Manufacturer Check the guard alarm for serviceability in compliance with Table 4 1 Table 4 1 Description and procedure of check Technical requirements Check of completeness Correspondence with ...

Страница 11: ...prove the guard alarm sabotage resistance and to allow for the additional equipment location an alarm button a network controller of the data acquisition and processing system etc Be sure to locate the cabinet and the signal processing unit in it so that the connecting cables of the sensor alarm stub remote monitoring stub and power leads are conveniently connected and the possibility of SPU perio...

Страница 12: ...ocable sheath visible deformation without its integrity breaking Sensor cuttings being used interconnect them with a coupling 5 4 Splicing the Ends of the Tribocable and Connecting Cable Splice the ends of the tribocable and connecting non sensitive cable To prepare the tribocable proceed slip a seal over the tribocable remove the external insulation of the tribocable for a distance of 35 to 40 mm...

Страница 13: ...e to insulate bare portions of the tribocable and non sensitive cable central conductors from accidental contact with the braided shield slip the braided shield over the cable connector and the bush so that the edges of the braided shield and the bush coincide In so doing make sure the tinned wire leads are arranged through the centre of the braided shield contact crimp the braided shield contacts...

Страница 14: ...tact crimp the braided shield contacts together with the tinned wire Make sure the diameter is not in excess of 16 mm slip the terminal unit case over the braided shield put seal and a plug into the terminal unit case tighten the clamp screws so that the terminal unit case fits tightly against the cable Make sure the locations of clamps and gaskets coincide To prevent moisture ingress into the ter...

Страница 15: ...on manual 15 6 Controls All controls and configurations can be done using PC program Connect SPU to PC via USB to RS485 connector Provided in standard equipment package Install provided Software For detailed configuration see Appendix 1 ...

Страница 16: ...uld be intact 1 2 SPU check for reliable grounding Inspect the points of ground connection visually Tighten the screws up Screw joints should be tightened safely 1 3 Visual inspection of the sensor adapter coupling and terminal unit The sensor adapter coupling and terminal unit should be free of damages The fastening to the fence should be intact 1 4 Guard alarm check for serviceability with the r...

Страница 17: ...fence stroke with a wooden stick branch stroke simulation The guard alarm being switched to the Alarm mode use the sensitivity controller to reduce the guard alarm sensitivity and proceed according to Items 2 2 and 2 3 The guard alarm should not go into the Alarm mode upon every check action 2 4 Grounding resistance measurement Use an ohmmeter to measure the grounding resistance R GR should not ex...

Страница 18: ... water transport distance unlimited provided the shipping boxes are secured according to the regulations applied to the given transport means 8 2 Guard alarms in Manufacturer s transit packing should be stored in heated and ventilated storehouses with air conditioning located in any macroclimatic areas at an ambient temperature from 5 С to 40 С and relative air humidity up to 80 at 25 С 8 3 The st...

Страница 19: ...anual 19 9 Repair and utilization 9 1 All types of the signal processing unit repair are to be performed by the Manufacturer 9 2 Utilization of the signal processing units that are not repairable is to be performed at enterprise JSC Forteza ...

Страница 20: ...ters specified in the present Operation Manual use should be made of the following calibrated measuring instruments multimeter accuracy class 2 5 megohmmeter accuracy class 1 5 dynamometer accuracy class 2 Note Use may be made of similar measuring instruments with accuracy class not less than the aforesaid ones ...

Страница 21: ...JSC Forteza Forteza Tribo M operation manual 21 Contacts JSC Forteza Tilzes str 38 LT 91112 Klaipeda Lithuania Phone 370 46 411353 Fax 370 46 412231 forteza forteza com www forteza com ...

Страница 22: ...JSC Forteza Forteza Tribo M operation manual 22 ...

Страница 23: ...JSC Forteza Forteza Tribo M operation manual 23 ...

Страница 24: ...JSC Forteza Forteza Tribo M operation manual 24 ...

Страница 25: ...JSC Forteza Forteza Tribo M operation manual 25 ...

Страница 26: ...JSC Forteza Forteza Tribo M operation manual 26 ...

Страница 27: ...JSC Forteza Forteza Tribo M operation manual 27 ...

Страница 28: ...JSC Forteza Forteza Tribo M operation manual 28 ...

Страница 29: ...JSC Forteza Forteza Tribo M operation manual 29 ...

Страница 30: ...JSC Forteza Forteza Tribo M operation manual 30 ...

Страница 31: ...JSC Forteza Forteza Tribo M operation manual 31 ...

Страница 32: ...JSC Forteza Forteza Tribo M operation manual 32 ...

Страница 33: ...JSC Forteza Forteza Tribo M operation manual 33 ...

Отзывы: