ROOF & FASCIAS
5b
50mm
TOP TIP:
Use measuring tape to measure out 2
equal lengths & cut with a sharp knife. Hammer the
tacks into the felt. Add the tacks at 150mm intervals.
Screw the OSB Roof Sheets
into position as
shown below into the frame and Central Roof
Beam. Ensure not to screw into the overhang
section of the roof.
Measure out 2 equal lengths
and overlap it on
the top, around the edges and
fold the corners
;
tack to keep secure.
Ensure 50mm at the bottom
and work from the bottom to the top.
Secure the Fascias
with screws as shown below.
Ensure to screw the Fascias into the framework
behind.
CAUTION
Ensure you screw into
the Central Roof Beam
underneath.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW
ROOF STRUCTURE
5a
501mm
368mm
28mm
Z-BRACKET
PREPARATION
Before placing the OSB Roof Sheets onto the roof,
screw
the Roof Support Strip
along the edge of the OSB Roof
Sheet. Ensuring it is flush to the edges. Add one strip onto
each sheet as shown below. The strip will be the same
length as one side of the sheet.
PREPARATION:
Attach the
Z-brackets onto the face at both
ends on the
Central Roof Beam
as shown below. The beam
should be flush to the Z-bracket.
ATTACHMENT:
Screw the Z-brackets
onto both
of the Triangular Pent Section frames
to secure
the
Central Roof Beam
as shown below. Use the
measurements provided. Ensure you are measuring
to and from the Central Roof Beam and the inner
wall panel frame shown below.
ATTACHMENT
501mm
368mm
Ensure the
Z-brackets are
in this position
to screw onto
the Apex
Sections
frame.
PRE-DRILL
WITH 2MM BIT