background image

8

ROOF & FASCIAS

5b

50mm

TOP TIP: 

Use measuring tape to measure out 2 

equal lengths & cut with a sharp knife. Hammer the 

tacks into the felt. Add the tacks at 150mm intervals.

Screw the OSB Roof Sheets

 into position as 

shown below into the frame and Central Roof 

Beam. Ensure not to screw into the overhang 

section of the roof.

Measure out 2 equal lengths 

and overlap it on 

the top, around the edges and 

fold the corners

tack to keep secure. 

Ensure 50mm at the bottom 

and work from the bottom to the top.

Secure the Fascias

 with screws as shown below. 

Ensure to screw the Fascias into the framework 

behind.

CAUTION

Ensure you screw into 
the Central Roof Beam 
underneath.

PRE-DRILL 

WITH 2MM BIT 

FOR ALL STEPS 

BELOW

ROOF STRUCTURE

5a

501mm

368mm

28mm

Z-BRACKET

PREPARATION

Before placing the OSB Roof Sheets onto the roof,

 screw 

the Roof Support Strip 

along the edge of the OSB Roof 

Sheet. Ensuring it is flush to the edges. Add one strip onto 

each sheet as shown below. The strip will be the same 

length as one side of the sheet.

PREPARATION:

 Attach the 

Z-brackets onto the face at both 

ends on the 

Central Roof Beam

 

as shown below. The beam 

should be flush to the Z-bracket.

ATTACHMENT:

 Screw the Z-brackets 

onto both 

of the Triangular Pent Section frames 

to secure 

the 

Central Roof Beam

 as shown below. Use the 

measurements provided. Ensure you are measuring 

to and from the Central Roof Beam and the inner 

wall panel frame shown below.

ATTACHMENT

501mm

368mm

Ensure the 

Z-brackets are 

in this position 

to screw onto 

the Apex 

Sections 

frame.

PRE-DRILL 

WITH 2MM BIT 

FOR ALL STEPS 

BELOW

Содержание SDP63GBARFP

Страница 1: ...ny questions or need advice our friendly team is here to help ISSUE 0221 SHIPLAP GARDEN BAR INSTRUCTIONS 6x3 Missing something or need more information Call our aftersales team on 0333 777 7089 Visit our website for spare instructions and more information www forestgarden co uk FIXING PACK CONTAINS 4x50mm Screws QTY 26 5x70mm Screws QTY 12 4x40mm Screws QTY 36 3 5x30mm Screws QTY 85 3 5x25mm Screw...

Страница 2: ... and doesn t deviate by any more than 15mm from edge to edge If this is not the case the building will twist causing gaps to appear in the sections and causing the roof doors and windows to misalign There is more information on base preparation on our website www forestgarden co uk Assembly is relatively straightforward if you follow these step by step instructions We recommend aligning components...

Страница 3: ...same footprint as the garden bar to allow surface water to run off without pooling A timber base can also be used Raise your garden bar 50mm above ground level 2 SEAL THE BEARERS If using a wooden base we recommend treating it with a treatment containing wax or oil Also coat the bearers that come into contact with the ground to prevent moisture rising 3 USE AN END GRAIN PROTECTOR To protect the co...

Страница 4: ...garden bar is made up of multiple sections where same size panels are interchangeable The door can be hinged on either side 4 GARDEN BAR PANEL LAYOUT Using the section layout below identify your side panel positions during assembly B C C B B 3 6 PENT A Indicates the panel orientation during construction ...

Страница 5: ...ition the floor in your desired location We recommend starting in a back corner then working from the back panel to the front panel for assembly FLOORS SIDES PRE DRILL WITH 2MM BIT FOR ALL STEPS BELOW SIDE PANEL BACK PANEL 1c Attach the Right Hand Triangular Pent Section by screwing to the back panel and side panel as shown below Attach the Left Hand Triangular Pent Section by screwing to the fron...

Страница 6: ...ach the Smaller Cover Strip as shown below You will need this to position your bar table for the correct height Attach the Window Cover Strips with 30mm screws Position and ensure your Table Back Piece is flush end to end and sitting on the Smaller Cover Strip underneath Fix with 70mm screws Attach the Angled Braces to the Table Back Piece Angle the screws to secure the braces into place Ensure th...

Страница 7: ...elow Ensure the shutter is positioned centrally Repeat this process for the other Outside Shutter Attach 2 hinges onto the inside shutter frame with the lip with the measurements provided Secure the Inside Shutter to the Outside Shutter Ensure the shutter is positioned centrally Position centrally and attach the turn buttons onto the Inside Shutter frame Ensure when the buttons turn they catch the...

Страница 8: ...BIT FOR ALL STEPS BELOW ROOF STRUCTURE 5a 501m m 368m m 28mm Z BRACKET PREPARATION Before placing the OSB Roof Sheets onto the roof screw the Roof Support Strip along the edge of the OSB Roof Sheet Ensuring it is flush to the edges Add one strip onto each sheet as shown below The strip will be the same length as one side of the sheet PREPARATION Attach the Z brackets onto the face at both ends on ...

Страница 9: ...pening Top Bottom Strip 28x12x765mm 4 28121637PDT Slamming Strip 28x12x1637mm 1 28280590DT Door Battens 28x28x590mm 2 28281802 Roof Batten 28x28x1802mm 2 38121710PDT Weather Strip 38x12x1710mm 1 40120828PDT Small Cover Strip 40x12x828mm 1 40120890PDT Window Cover Strip 40x12x890mm 1 40121695PDT Cover Strip 40x12x1695mm 3 40121925PDT Cover Strip 40x12x1925mm 2 45281714P Central Roof Beam 45x28x1714...

Отзывы: