—
48
—
Tent Camper Owner’s Manual
C
ampsite
s
eleCtion
and
s
et
-U
p
After taking delivery of your new tent camper, take a
short trip to a local campground. Practice pulling into
a space and backing up. Take time to learn how to con-
nect to the campground water and sewer, and how to
operate the various elements of your camper.
Learn all you can about your new camper before tak-
ing it on an extended trip. Becoming familiar with all
facets of your new camper will make your first camping
experience more enjoyable.
s
et
-U
p
t
ips
and
p
reCaUtions
Before setting up your new camper, always keep the fol-
lowing tips and guidelines in mind:
1. Choose a campsite that is as level as possible from
side to side. An uneven campsite can cause binding
of the lifting system.
2. Be sure there are no low hanging branches or other
obstructions that could interfere with moving the
camper onto the site, raising the roof, or extending
the bunks.
3. Check the placement of campsite electric utility
outlets, keeping in mind the length of the camper’s
power cord.
4. Be sure to release all four roof latches before at-
tempting to raise the roof.
5. To prevent movement, place blocks in front of or
behind, the camper wheels.
6. Remove all items you may have stored on the roof,
before attempting to raise it.
7. Be sure the awning, (if equipped), is attached to the
camper before raising the roof.
F
lagstaFF
t
ent
C
amper
- ltd, maC,
maC o
FF
r
oad
, C
lassiC
, H
igH
W
all
1. Once you have selected your campsite, make
sure you position your camping trailer on level
ground. Before starting the set up procedure,
be sure that the battery is properly connected to
power the unit if you plan on operating an elec-
tric lifter system or optional power tongue jack.
(High Wall models only).
2. MaC off road only: To access the Off-Road front
storage deck and install the loading ramp, remove
the (6) locking safety pins from the steel deck rails.
Remove the steel deck rails, and mount them on the
side of the deck by inserting the bolts on the ramp
end into the openings in the steel mesh deck. You
are now ready to load your ATV.
When disassembling, remove the ramps; and re-
turn them to the “rail” position on the trailer. Then,
insert the locking safety pins into all (6) locations.
i
nitial
exterior
set
-
Up
3. Begin with inserting the dolly wheel onto the jack
post (if desired) and locking into place. Disconnect
the safety chains from the tow vehicle and unplug
the electrical connection. Now crank the handle on
the dolly jack and lower the jack post to the ground.
A small wood block can be used to prevent the jack
post or dolly wheel from sinking into the ground.
Now release the coupler latching lever and raise the
coupler free of the hitch ball with the dolly jack.
s
et
U
p
i
nstrUCtions
Содержание 2014 Flagstaff
Страница 1: ...TenT Camper Owner s manual ...
Страница 8: ... 8 Tent Camper Owner s Manual S a m p l e S a m p l e ...
Страница 62: ... 62 Tent Camper Owner s Manual ...