background image

 

 

 

Joined the group, the maximum unit of IP07M total 5 units: 

When 3rd, 4th, 5th IP07M need to join the same group, please follow the following steps: 

 
1. Connect the 3/4/5th of IP07M first then press SETTING button 1~3 seconds of the unit, 

the blue/green LED will be flashing. 

2. After complete the above steps, the blue/green LED become ON status that mean 3-5

th

   

IP07M have successfully joined the group.

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Group 1 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Group 2 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Group 3 

Both wiring must be 

away at least 30cm

 

 

Both wiring must be 

away at least 30cm

 

 

FORESIGHT CCTV INC. | 5863 Leslie Street, Unit #713, Toronto, Ontario,Canada M2H1J8 | http://www.foresight-cctv.com | 1-888-GO2-CCTV

Содержание IP07M

Страница 1: ...s and many more IP07M Chainable IP Extender with Power over Coax Two Wire Extend IP camera signal with power over existing coaxial cable or any two wire cable Extend Ethernet or any TCP IP devices up to 1 5Km Provide IP camera power up to DC12V 1Amp 12W distance up to 500M Support chainable series star connection up to 4 IP cameras Support 10 100BASE T transmission rate When doing one camera to IP...

Страница 2: ...pplication Four IP camera Series Application Four IP camera Star configure Application Four IP camera Circle configure Application FORESIGHT CCTV INC 5863 Leslie Street Unit 713 Toronto Ontario Canada M2H1J8 http www foresight cctv com 1 888 GO2 CCTV ...

Страница 3: ... 11 2 X Coax Cable RG6U 500M 73 1A Power Input DC 56V CABLE Distance Max Data Rate Mbps DC 12V Output Telephone cable 0 65mm 200 400M 72 500mA UTP cable CAT 5e 600M 55 1A Coax Cable RG59U 500M 67 1A 1300M 9 5 x Coax Cable RG6U 700M 72 1A Recommend external power adapter must use DC 48 56V LED Indication LED Indication Status Function Green ON Power ON OFF Blue ON Under Linking Red OFF Linking fail...

Страница 4: ...s of second unit of IP07M the second IP07M blue green LED flashing 3 After complete the above steps the blue green LED become ON status that mean the group has successfully established Reset to factory default To press the SETTING button 10 seconds the blue green LED will be flash After reset the green LED will be on Recommend to reset to factory default if you do not sure the unit have been set g...

Страница 5: ... 1 3 seconds of the unit the blue green LED will be flashing 2 After complete the above steps the blue green LED become ON status that mean 3 5th IP07M have successfully joined the group Group 1 Group 2 Group 3 Both wiring must be away at least 30cm Both wiring must be away at least 30cm FORESIGHT CCTV INC 5863 Leslie Street Unit 713 Toronto Ontario Canada M2H1J8 http www foresight cctv com 1 888 ...

Страница 6: ...Power output will be varied based on the power source input 6 The wiring must away from any equipment with electromagnetic wave in order to avoid transmission distance become shorter i e mobile phone microwave radio equipment fluorescent lamp power lines Package Model no Contents IP07M IP07M x 1 unit Screw pack x 1 bag Rubber Pad x 1 bag IP07MK IP07M x 2 units Screw pack x 1 bag Rubber Pad x 1 bag...