 System Start-Up and Checkout 

(continued)

CAUTION

      

Avoid operating boiler in an environment where 

saw dust, loose insulation fibers, dry wall dust, 

etc. are present.  If boiler is operated under 

these conditions, burner interior and ports 

must be cleaned and inspected daily to ensure 

proper operation.

!

Figure 9-5: Main Burner Flame

J.  Check Main Burner Flame (see Figure 9-5)
 

1. NORMAL FLAME:

 

 

a. Clearly defined inner cone with no yellow  

           tipping.

 

 

b. Orange-yellow streaks caused by dust  

 

    should not be confused with true yellow  

 

    tipping.

 

2.    ABNORMAL FLAME (if found, check inlet and  

 

outlet gas pressure. Procedure found in   

 

following steps):

 

 

a. Overfired - large flame

 

 

b. Underfired - small flames

 

 

c. Lack of primary air - yellow tipping on  

           flames.

K.  Check gas Inlet pressure
 

1.  While boiler and all other gas appliances  

 

are not firing, gas inlet pressure should not  

 

exceed ½ psig.

 

2. While boiler and all other gas appliances   

    are firing, gas inlet pressure must be  

 

    between minimum and maximum shown    

    on rating label.

L.  Check gas outlet (manifold) pressure
 

1.   Install manometer on 1/8" outlet pressure  

 

tap on gas valve (see Figure 9-2). Use    

 

of shutoff valve between manometer and gas  

 

valve can prevent pressure surge that blows  

 

out manometer fluid.

 

2. Adjust regulator on gas valve so manifold  

    pressure matches values listed on rating label.

 

3. Turning regulator adjustment screw  

 

    clockwise (

) increases pressure.

 

4. Turning regulator adjustment screw  

   

     counterclockwise (

) decreases pressure.

M.  Check gas input rate to boiler
 

1.  When checking rate, ensure all other    

 

appliances connected to same meter as  

 

boiler are off.

 

2.  Input ratings shown on boiler rating label  

 

can be used for elevations up to 2,000 ft. For  

 

elevations 2,000 ft. or higher, reduce input  

 

rate to 4 percent per 1,000 ft. above sea level.  

 

Do not install at elevations above 12,000 ft.  

 

See Table below.

Input (MBH)

Boiler 

Mode

Rating 

Label

5,000 ft. 7,000 ft. 10,000 ft.

FORCE02E

38

30.5

27.5

23.0

FORCE03E

68

54.5

49.0

41.0

FORCE04E

102

81.5

73.5

61.0

FORCE05E

136

109

98.0

81.5

FORCE06E

170

136

122.5

102.0

FORCE07E

204

163

147.0

122.5

FORCE08E

238

190.5

171.5

143.0

FORCE09E

272

217.5

196.0

163.0

N.  Measure carbon monoxide (CO) level in vent after 

5 minutes of main burner operation. CO should 

not exceed 400ppm air free.

O.  Check vent damper operation.  
 

Vent damper must be in open position when 

Содержание FORCE02E

Страница 1: ...ge Specifications 3 Pre installation 4 Removing Existing Boiler 5 Clearances 5 Venting 7 Water Piping 10 Gas Piping 13 Electrical 14 System Start Up and Checkout 17 Operation 22 Before Leaving Jobsite...

Страница 2: ...ate injury WARNING Indicates a hazardous situation that if not avoided could result in death or serious injury DANGER Explosion Hazard DO NOT store or use gasoline or other flammable vapors or liquids...

Страница 3: ...Supply NPT Return NPT Vent in Gas NPT Relief Valve NPT Drain NPT Maximum Allowable Working Pressure PSI FORCE02E 2 32 14 40 1 1 4 1 1 4 4 1 2 3 4 3 4 50 FORCE03E 3 32 14 40 1 1 4 1 1 4 4 1 2 3 4 3 4 5...

Страница 4: ...combustion and dilution air I Do not install boiler where gasoline or other flammable vapors or liquids are stored Avoid areas near chemical products containing chlorine chloride based salts chloro f...

Страница 5: ...Instructions Adjust thermo stat so appliance will operate continuously 5 Test for spillage at the draft hood relief opening after 5 minutes of main burner operation Use the flame of a match or candle...

Страница 6: ...ector Otherwise follow vent connector manufacturer s recommended clearances Additional height required to maintain 6 clearance from all vent connector components Vent damper may be installed in vertic...

Страница 7: ...yhavingjurisdiction orStandard for Chimneys Fireplaces Vents and Solid Fuel Burning Appliances NFPA 211 Masonry chimney must be lined with listed clay flue lining or listed chimney lining system 3 Sin...

Страница 8: ...with head room available and required clearancefromadjacentcombustiblebuilding structure Ventpipeshouldbeinstalledabove bottom of chimney to prevent blockage 6 Slope vent pipe upward from draft diver...

Страница 9: ...Gas Vent Roof Slope Heights Roof Slope ft Flat to 6 12 1 0 Over 6 12 to 7 12 1 25 Over 7 12 to 8 12 1 5 Over 8 12 to 9 12 2 0 Over 9 12 to 10 12 2 5 Over 10 12 to 11 12 3 25 Over 11 12 to 12 12 4 0 O...

Страница 10: ...return piping to boiler Refer to Figures 6 3 and 6 4 Also consult Residential Hydronic Heating Installation and Design I B R Guide Maintain minimum inch clearance from hot water piping to combustible...

Страница 11: ...l Zone Valve Controlled System System Circulator System Zone Valves Zone Circulators Full Port Isolation Valves Flow Check From System Full Port Isolation Valves Drain Valve Safety Relief Valve Pipe w...

Страница 12: ...in 6 of floor or drain Drain Valve IWH Return IWH Supply Indirect Water Heater IWH Air Separator Air Vent Expansion Tank Backflow Preventer Fill Valve Cold Water Return Full Port Isolation Valves Unio...

Страница 13: ...nt i e water heater cooking equipment B Connect boiler to gas supply system 1 Use methods and materials in accordance with local plumbing codes and requirements of gas supplier In absence of such requ...

Страница 14: ...lectrical circuit must be run from the main electrical service with an over current device disconnect in the circuit A service switch is recommended and may be required by some local jurisdictions Con...

Страница 15: ...15 FORCE E Installation Operating Service Manual 109444 03 12 19 Figure 8 1 Wiring Connection Diagram 8 Electrical continued...

Страница 16: ...16 FORCE E Installation Operating Service Manual 109444 03 12 19 Figure 8 2 Schematic Ladder Diagram 8 Electrical continued...

Страница 17: ...6 3 and 6 4 Note Terminate hose in five gallon bucket at a suitable floor drain or outdoor area 5 Starting with one circuit open zone valve or start circulator 6 Open drain valve 7 Open fill valve 8...

Страница 18: ...18 FORCE E Installation Operating Service Manual 109444 03 12 19 Figure 9 1 Operating Instructions 9 System Start Up and Checkout continued...

Страница 19: ...produces single flame Flame should be steady medium hard blue enveloping 3 8 to 1 2 inch of igniter sensor tip See Figure 9 3 9 System Start Up and Checkout continued 4 Turn OFF the electric switch to...

Страница 20: ...sure 1 Install manometer on 1 8 outlet pressure tap on gas valve see Figure 9 2 Use of shutoff valve between manometer and gas valve can prevent pressure surge that blows out manometer fluid 2 Adjust...

Страница 21: ...ermostat to call for heat and push TEST SETTINGS button on Hydrostat 3200 to simulate low water condition Red LOW WATER LED will illuminate and burner will shut down Release TEST SETTINGS button and b...

Страница 22: ...ent Measurement Procedure See Figure 10 3 Measuring pilot flame current with micro ammeter a Pilot flame current in micro amps can be measured using any standard micro ammeter by inserting meter probe...

Страница 23: ...to normal sequence If flame out of sequence remains longer than 10 seconds con trol will resume normal operation 1 hour after error is corrected Check for pilot flame Replace gas valve if pi lot flam...

Страница 24: ...t pressure Checked gas manifold pressure Checked CO level in vent Checked vent damper operation Check ignition system safety shut off device Tested LWCO functionality Tested high limit operation Teste...

Страница 25: ...d loose fitting clothing that is sufficiently tight around potential entry points for RCF dust 3 Gloves 4 Eye protection such as goggles safety glasses with side shields or full facepiece Take steps t...

Страница 26: ...ion and there are no openings into chimney 3 Remove soot accumulations with wire brush and vacuum 4 Repair or replace deteriorated vent pipe and vent accessories 5 Inspect piping to determine that it...

Страница 27: ...er Access Panel Connect Flame Rollout Switch wires E Inspect Water Piping 1 Check all system piping for leaks 2 Repair any leaks before placing back into service 12 Service and Maintenance continued F...

Страница 28: ...p and Checkout Check LWCO Functionality S Check High Limit Control See Start up and Checkout Check High Limit Control T Check Thermostat Operation See Start up and Checkout Check Thermostat Operation...

Страница 29: ...well S8610M Ignition Module Ignition module will sense pilot flame Once pilot flame is established ignition module opens gas valve and main burners will ignite When thermostat is satisfied ignition mo...

Страница 30: ...30 FORCE E Installation Operating Service Manual 109444 03 12 19 3 1 2 5 4 6 7 On rear of boiler Rear of Boiler 3 13 How It Works continued...

Страница 31: ...lable for use 3 Check electrical connections on boiler before proceeding see Figure 8 1 and Figure 8 2 4 Ensure 120VAC power polarity is correct and boiler is properly grounded 5 Controls are tested d...

Страница 32: ...once to clear the pilot supply tubes of air Spark stops when pilot is lit Yes No Note If control goes into lockout or retry delay reset the Call For Heat Check continuity of ignition cable and ground...

Страница 33: ...109871 02 1 109871 03 1 109871 04 1 109871 05 1 109871 06 1 109871 07 1 109871 08 1 109871 09 1 1B Canopy Gasket 109943 01 1 1C Canopy 109944 02 1 109944 03 1 109944 04 1 109944 05 1 109944 06 1 10994...

Страница 34: ...03 1 109941 04 1 109941 05 1 109941 06 1 109941 07 1 109941 08 1 109941 09 1 2B Base Tray 2C Burner Tray 2D Base Side Insulation 2E Base Rear Insulation 2F Base Front Insulation 2G Drip Shields 2H Man...

Страница 35: ...109958 03 1 109958 04 1 109958 05 1 109958 06 1 N A Gas Manifold N A 109958 07 1 109958 08 1 109958 09 1 3C 47 Orifice Natural Gas 109959 01 1 16 orifices 1 20 mm Orifice LP Gas 109954 01 1 16 orific...

Страница 36: ...al 109444 03 12 19 Key No Description Part Number Quantity FORCE02E FORCE03E FORCE04E FORCE05E FORCE06E FORCE07E FORCE08E FORCE09E 4A Hydrostat 3200 LWCO High Limit 109952 01 1 4B Honeywell S8610M EI...

Страница 37: ...FORCE05E FORCE06E FORCE07E FORCE08E FORCE09E 5A Wrap around Jacket Panel Not available 5B Jacket Vestibule Panel 109618 02 1 109618 03 1 109618 04 1 109618 05 1 109618 06 1 109618 07 1 109618 08 1 10...

Страница 38: ...ORCE07E FORCE08E FORCE09E 6A Water Manifold 109968 01 1 6B Temperature Pressure Gauge 109966 01 1 6C 30 PSI Safety Relief Valve 109964 01 1 6D Drain Valve Source Locally 3 4 NPT boiler connection 6E V...

Страница 39: ...FORCE03E FORCE04E FORCE05E FORCE06E FORCE07E FORCE08E FORCE09E 7A Power Supply Harness 109963 01 1 7B Main Control Harness 109957 01 1 7C Ignition Harness 109953 01 1 Key No Description Part Number Q...

Страница 40: ...Guide Appendix Combination Refrigeration Heating System Water Chiller Shut off valves Shut off valves Expansion Tank Circulator Supply main to combined heating cooling system Return main from combined...

Страница 41: ...ing during these heating season shoulders is unlikely to cause problems Larger volume systems during the shoulder heating seasons or systems with aggressive set back or low temperature systems will ca...

Страница 42: ...e by pass piping to reduce condensation Again this is a fixed system It can not adapt to variations in temperature and flow Best Alternative System by pass kit part number 107795 01 that addresses the...

Страница 43: ...43 FORCE E Installation Operating Service Manual 109444 03 12 19...

Страница 44: ...44 FORCE E Installation Operating Service Manual 109444 03 12 19...

Отзывы: