________________________________________________________________________________
78
AST 14 C 258/00
7.2 125/80 CO-AXIAL AIR/VENT DUCTS
Installation type: C13 - C33
Pipe maximum length*
TYPE OF
INSTALLATION
PIPING MATERIAL
KRB 12
KC-KRB 24
KC-KRB 28
Air
intake
Flue gas vent
L max
[m]
L max
[m]
L max
[m]
C13 – C33
aluminium polypropylene
13.5
14.5 13.5
* The first elbow from the boiler is not to be accounted for
Flue fitting load loss
Component
KCK-RB 12 - 24 - 28
[m]
Extension 1 m
1.0
Extension 0.5 m
0.5
90° elbow
1.0
45° elbow
0.5
Roof vent terminal
1.5
Wall terminal kit + 90° elbow
1.5
7.3 80/80 SPLIT AIR/VENT DUCTS
Pipe maximum length
Type of installation: C43 - C53 - C83*
TYPE OF
INSTALLATION
PIPING MATERIAL
KRB 12
KC-KRB 24
KC-KRB 28
Air
intake
Flue gas vent
L max
[m]
L max
[m]
L max
[m]
C43 – C53 – C83
aluminium polypropylene
152
84
91
* The minimum length of intake and discharge line must be one meter
Type of installation B23 - B53*
TYPE OF
INSTALLATION
PIPING MATERIAL
KRB 12
KC-KRB 24
KC-KRB 28
Air intake Flue gas vent
L max
L max
L max