
6
FIGURE INDEX
fig. 1 - Control panel .....................................................................................................................................................................................................................................page 7
fig. 2 - Filler cock ............................................................................................................................................................................................................................................page 23
fig. 3 - Dimensions .........................................................................................................................................................................................................................................page 27
fig. 4 - Hydraulic connections (model KRB) ..........................................................................................................................................................................................page 28
fig. 5 - Hydraulic connections (model KRB V) ......................................................................................................................................................................................page 28
fig. 6 - Hydraulic connections (model KRB Z) ......................................................................................................................................................................................page 28
fig. 7 - Key components - front view .......................................................................................................................................................................................................page 29
fig. 8 - Key components - side view ........................................................................................................................................................................................................page 30
fig. 9 - Hydraulic diagram ...........................................................................................................................................................................................................................page 31
fig. 10 - KRB 12 CH circulation pump available head ........................................................................................................................................................................page 34
fig. 11 - KRB 24 CH circulation pump available head ........................................................................................................................................................................page 35
fig. 12 - KRB 28 CH circulation pump available head ........................................................................................................................................................................page 35
fig. 13 - KRB 32 CH circulation pump available head ........................................................................................................................................................................page 35
fig. 14 - High-temperature CH circulation pump available head (V version) ...........................................................................................................................page 36
fig. 15 - Low-temperature CH circulation pump available head (V version) ............................................................................................................................page 36
fig. 16 - High-temperature CH circulation pump available head (Z version) ...........................................................................................................................page 36
fig. 17 - Zone 1 low-temperature CH circulation pump available head (Z version) ..............................................................................................................page 37
fig. 18 - Zone 2 low-temperature CH circulation pump available head (Z version) ..............................................................................................................page 37
fig. 19 - Position of coaxial duct system ................................................................................................................................................................................................page 42
fig. 20 - Dimensions for coaxial duct system .......................................................................................................................................................................................page 42
fig. 21 - Position of split venting system ...............................................................................................................................................................................................page 43
fig. 22 - Dimensions of split venting system ........................................................................................................................................................................................page 43
fig. 23 - Venting tower ..................................................................................................................................................................................................................................page 44
fig. 24 - Flue gas analysis ports .................................................................................................................................................................................................................page 44
fig. 25 - Gas connection ...............................................................................................................................................................................................................................page 45
fig. 26 - Connection for condensate drain ............................................................................................................................................................................................page 46
fig. 27 - Thermoregulation curves ...........................................................................................................................................................................................................page 49
fig. 28 - KRB wiring diagram ......................................................................................................................................................................................................................page 53
fig. 29 - KRB V wiring diagram ...................................................................................................................................................................................................................page 55
fig. 30 - KRB Z wiring diagram ...................................................................................................................................................................................................................page 57
fig. 31 - Adaptation to other gas types ..................................................................................................................................................................................................page 60
fig. 32 - Removing the mixer .....................................................................................................................................................................................................................page 60
fig. 33 - Changing nozzles ..........................................................................................................................................................................................................................page 60
fig. 34 - Fitting the mixer .............................................................................................................................................................................................................................page 60
fig. 35 - Adjustment of the gas valve ......................................................................................................................................................................................................page 61
TABLE INDEX
Table 1 - Boiler status - LCD indications during normal operation ..............................................................................................................................................page 9
Table 2 - Boiler status - LCD indications in the event of malfunction .........................................................................................................................................page 10
Table 3 - Displayable parameters with info button ...........................................................................................................................................................................page 19
Table 4 - KRB 12 model adjustment rates ............................................................................................................................................................................................page 32
Table 5 - KRB 24 model adjustment rates ............................................................................................................................................................................................page 32
Table 6 - KRB 28 model adjustment rates ............................................................................................................................................................................................page 32
Table 7 - KRB 32 model adjustment rates ............................................................................................................................................................................................page 32
Table 8 - Technical features ........................................................................................................................................................................................................................page 33
Table 9 - Combustion specifications, model KRB 12 ........................................................................................................................................................................page 33
Table 10 - Combustion specifications, model KRB 24 .....................................................................................................................................................................page 34
Table 11 - Combustion specifications, model KRB 28 .....................................................................................................................................................................page 34
Table 12 - Combustion specifications, model KRB 32 .....................................................................................................................................................................page 34
Table 13 - Burner re-ignition temperatures .........................................................................................................................................................................................page 46
Table 14 - Limits to be set for TSP parameters and default values based on boiler type (TSP0) ......................................................................................page 47
Table 15 - General table of parameters .................................................................................................................................................................................................page 50
Table 16 - Relationship between temperature (°C) and nominal resistance (Ohm) of the SR heating probe .............................................................page 59
Table 17 - CO
2
values ...................................................................................................................................................................................................................................page 61
Table 18 - Diameter of nozzles - diaphragms .....................................................................................................................................................................................page 61
4. Testing the boiler .....................................................................................................................................................................................page 62
4.1. Preliminary checks............................................................................................................................................................................................................................page 62
4.2. Switching on and switching off ...................................................................................................................................................................................................page 62
5. Maintenance .............................................................................................................................................................................................page 63
5.1. Maintenance schedule ....................................................................................................................................................................................................................page 63
5.2. Combustion analysis .......................................................................................................................................................................................................................page 63
6. Troubleshooting ......................................................................................................................................................................................page 64
Содержание GIAVA KRB 12
Страница 1: ...IST 03 C 629 03 INSTALLATION USE AND MAINTENANCE GIAVA KRB 12 24 28 32 EN...
Страница 30: ...30 fig 8 21 20 Ref no Description 20 CH system filler cock 21 Hydraulic separator...
Страница 66: ...66...
Страница 67: ...67...