background image

 

 

 

Page 8 of 20

 

 
 

 
 

3 – INSTALLATION: 
  
 

a) Included parts, materials and required tools for installation: 

-Appliance and designated parts are the fire box, anchor plate (or pedestal 
if  any),  black  steel  flue  pipe,  focus  kit  (protective  glove,  mounting  gloves, 
can of touch-up paint), ash removal hatch, and insulating washers. 
-Required  tools:  drill,  M8  allen  key,  level,  screwdrivers,  M12  key, 

scaffolding (up to underceiling height), refractory compound.

 

-2 persons minimum are required for installation. 
 

 
b) Options: 
•  custom ceiling cover disc (steel disc) + cover disc screw kit 
•  custom anchor steel plate (inclined...) 
•  focus black steel flue extension 
•  pedestal 
•  anthracite grey paint 
• custom roof outlet in stainless or lacquered steel with insulation and cap 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Agora 850

Страница 1: ...ement d Structural requirement e Connector f Fresh air intake g Clearances to combustibles 3 INSTALLATION a Included parts materials and required tools for installation b Options c Assembly details 4...

Страница 2: ...oosing focus fireplaces Appliance designation agorafocus 850 Manufacturer focus atelier dominique imbert le fort 34380 viols le fort France 2 SPECIFICATIONS NOT FOR MOBILE HOME INSTALLATION DO NOT CON...

Страница 3: ...nch length custom made Flue weight 30 kg per meter 21 lbs per foot Anchor plate weight approx 22 kg 48 lbs 2 5 mm 1 10 inch thick steel High heat resistant matte black paint Guaranteed efficiency with...

Страница 4: ...l requirement CAUTION THE SUPPORT OF THE ANCHOR PLATE ROOF STRUCTURE SLAB ETC OR PEDESTAL FLOOR SLAB ETC MUST BE SIZED IN CONGRUENCE WITH THE FIREPLACE STATIC AND DYNAMIC CHARGES THE SIZE CALCULATION...

Страница 5: ...ir intake For optimum functioning focus requires a fresh air intake in the room ideally under of the fire We recommend deflect O A0684 semi rigid aluminium duct The wall plate is supplied with a fresh...

Страница 6: ...Page 6 of 20 g Clearances to combustibles Clearances to floor and ceiling USE OF PROVIDED FIREBOX INSULATOR UNDER THE GRATE IF ANY FIRE BRICKS OR VERMICULITE IS COMPULSORY...

Страница 7: ...AS INDICATED FURTHER APPLY Important manufacturer specifications When placed close to a non combustible wall leave a minimum of 8 for proper ventilation To avoid premature aging of your painted walls...

Страница 8: ...int ash removal hatch and insulating washers Required tools drill M8 allen key level screwdrivers M12 key scaffolding up to underceiling height refractory compound 2 persons minimum are required for i...

Страница 9: ...Page 9 of 20 c Assembly details Suspended design stainless steel chimney system anchor plate detail...

Страница 10: ...Page 10 of 20 focus flue attachment to stainless steel chimney system plate...

Страница 11: ...spended design detail Note the junction sleeves are manufactured only in case the floor to ceiling height in the room requires to manufacture the focus pipe in several parts you may not find junction...

Страница 12: ...Page 12 of 20 Suspension mechanism detail...

Страница 13: ...Page 13 of 20 Pedestal design stainless steel chimney system cover disc detail...

Страница 14: ...SHOULD BE PLACED IN A METAL CONTAINER WITH A TIGHT FITTING LID THE CLOSED CONTAINER OF ASHES SHOULD BE PLACED ON A NON COMBUSTIBLE FLOOR OR ON THE GROUND WELL AWAY FROM ALL COMBUSTIBLE MATERIALS PEND...

Страница 15: ...first fire should be a modest one do not use packing material or pallet wood for fuel The paint finish we use oven baked at 250 C for 30 minutes is thermo plastic Because of the very gradual polymeris...

Страница 16: ...ake To maintain or refuel your fire add when needed see note a few larger logs Note For the same weight of fuel 10 logs will burn more intensely and faster than 3 logs but you will get the same heat p...

Страница 17: ...ANCE OF THIS CAUTION IS NOT COVERED UNDER FOCUS LIMITED WARRANTY b Creosote formation and need for removal When wood is burned slowly it produces tar and other organic vapors which combine with expell...

Страница 18: ...r surfaces can be wiped with a soft dry rag making sure the metal is cool For continued use of the touch up paint can following its initial usage invert the can spray head down and spray into a balled...

Страница 19: ...only when our fireplaces have been installed with respect to all local building codes and with strict attention to the technical details outlined in our Plan Study as well as our installation mainten...

Страница 20: ...tep 1 to convert values not expressed as R ii For multiple layers add R values of each layer to determine overall R value 3 If the overall R value of the system is greater than the R value of the spec...

Отзывы: