VENTILATION
No purpose provided ventilation is normally required with this appliance. However, the ventilation requirements
of other gas appliances in the same room or space should be taken into consideration. A spillage test should be
carried out as described in the relevant section with the doors and windows both open and closed, and with any
extractor fan running on full. Where fitted, ventilation must comply with the requirements of BS 5440 part 2.
Vents directly underneath or within the immediate vicinity of appliances must not be used as they may
adversely affect ODS pilot operation.
Note: For Republic of Ireland see IS813, ICP3 and IS327 and any other rules in force.
UNPACKING THE APPLIANCE
Stand the carton right way up, cut the strapping bands and remove the top end cap. Read all the instructions
before continuing to unpack or install this appliance.
Remove the box containing the cast front fret, and the bag containing the coals. Remove the cardboard packing
pieces, and any bags containing other fittings or parts. When all loose parts have been removed, the outer sleeve
may be lifted off to reveal the appliance.
Check that the components supplied correlate with the checklist given in section 7.1.
Please dispose of the packaging materials at your local recycling centre.
COMPONENT CHECKLIST
QUANTITY
DESCRIPTION
QUANTITY
DESCRIPTION
1
Convection box and burner tray assembly
1
Complete fan assembly
1
Decorative fireframe
1
Twin-walled tubular flue
1
Cast front fret with separate ashpan cover
1
Rockwool rear fire jacket
1
Moulded ceramic fibre combustion matrix
1
Terminal guard cage
1
Pair of front coal strips
1
Fan box trim
1
Ceramic burner pad
22
Moulded ceramic coals
1
Set of manufacturers instructions and guarantee form
1
Bag of fixings (10 rawl plugs, 10 No8x1.5 screws)
3
Lengths of sealing strip
PREPARING FOR INSTALLATION
Remove the fire tray from the convector box by removing the two securing screws in the front legs of the tray
and rear mounted transit screw if fitted, and inverting the tray onto the hearth. Carefully unplug the safety
solenoid on the tray from the control box by squeezing the clip on the three way connector and easing apart.
Place the tray safely to one side along with the fuel bed components, firefront and decorative frame.
The four radiant panels may now be fitted inside the firebox.
Select the plain or patterned side of the panels and insert as
follows; Lay the firebox on it’s back.Lay the tapered and
small rectangular panels onto the rear faces of the firebox.
The side panels should be fitted by inserting their front
edges into the pre-fitted retaining brackets on the front face
of the firebox. Gently align the side panels with the sides of
the firebox, over the top of the back panels already in place.
Make sure that the side panels are pushed up firmly to the
roof of the firebox, and back firmly to retain the rear panels.
Make small adjustments to line up the mortar lines if
required. Clamp the side and back panels using the ‘Z’ shaped brackets and
screws provided. The screws should locate into the pre-punched holes in the firebox. Fit the two side infill panels
to the lower sides of the firebox, using the screws provided in the pre-punched holes (see photograph).
5
6.0
8.0
7.0
7.1