![FOAMICO 7011613 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/foamico/7011613/7011613_operation-manual_2313315011.webp)
11
MO 0145-4 NEXT 701613-18_UK
15-04-2019
5
Operation
5.1 Start and stop procedure.
ATTENTION! Do not start the mobile station until the pipe system has been filled with water and vented.
Do not start the Mobile station until the pump has been filled with water and vented. If the system runs dry
or partly filled the pump and other components may be damaged.
Start:
1. Connect the hose to the coupling
POS E
fig. 5.1 make sure the valve is closed.
2. Make sure the low-pressure valve/ gun at the end of the hose is closed
3. Open the ball valve
POS E
fig.5.
The mobile station is now ready.
4. The mobile station is designed and programmed so it can operate with high and low pressure. By turning
the switch
POS. K
, Fig. 5.1, the operation mode can be changed between high and low pressure. If the
switch is in position
I
, the machine will deliver 25bar low-pressure. When the switch is in position
II
, 40 bar
high-pressure will be delivered.
STOP:
1. The mobile station is stopped by turning the Handle
POS D
fig 5.1 into
2. ATTENTION! When the system is not used it is recommended to turn the handle into stop position
3. ATTENTION! In case of service the Electrical main switch shall always be turn off.
5.2 Rinsing operation
1. Mount the rinsing nozzle or rinsing pipe in the coupling at the low-pressure valve / gun (marked with blue
or green protection)
2. set the handle
POS D
fig. 5.1 in rinse position
3. The system is now ready for rinsing. Rinse by open the low-pressure valve / gun.
4. ATTENTION! After rinsing the hose must be depressurized. Close the valve
POS E
fig. 5.1 and open the
low-pressure valve/gun. The hose can now be disconnected.
5.3 Foam operation
1. Mount the foam nozzle in the coupling at the low-pressure valve / gun (marked with white)
2. set the handle
POS D
fig. 5.1 in rinse position.
3. Adjust the air pressure to 4-6 bar on the regulator
POS H
fig. 5.1 (differs from detergent to detergent.
Often has to be fine-tuned during first time foaming)
4. The system is now ready to foam. Apply foam by opening the low-pressure valve/gun
5. After foaming the system must be rinsed with clean water. Place hose for detergent in a container with
clean water. Open the low-pressure valve/ gun for minimum 15 sec.
6. ATTENTION! Set the handle
POS D
fig. 5.1, back in rinse position
when Foam operation is ended.
7: ATTENTION! Before choosing another cleaning operation with another chemical, the system must be
flushed with clean water for at least 30 seconds. This is done by following the instructions in 5.2 rinsing
operation”
5.4 Spray disinfection.
1. Mount the disinfection nozzle in the coupling at the low-pressure valve / gun (marked with yellow
protection)
Содержание 7011613
Страница 23: ...23 MO 0145 4 NEXT 701613 18_UK 15 04 2019 9 3 Overview Mobile unit MO 0 5 without compressor...
Страница 31: ...31 MO 0145 4 NEXT 701613 18_UK 15 04 2019 9 9 Spare parts Air regulator complete with bracket 1001488...
Страница 32: ...32 MO 0145 4 NEXT 701613 18_UK 15 04 2019 10 Electrical diagram...