Quick Installation Guide
In a Plug & Play configuration the set-up of the EMGZ309 and force sensor is limited
to only the offset compensation and the calibration.
3.1
Preparations for Set-up
1.
Read the Operation Manual of your force measuring sensors
2.
Check your requirements such as:
– Display unit of nominal force
– additional output configuration 0…10V or 0/4… 20mA on display
3.
Draw the wiring diagram for your configuration (ref. to 3.5 “Wiring the Amplifier“)
4.
If required, determine special parameters (ref. to 8.2 “Parameter List”)
3.2
Installation Procedure
1.
Mount your force maesuring sensors to the machine frame
2.
Wire the Force Measuring Sensor(s) (ref. to Fig. 4)
3.
Connect the amplifier to the power supply. The power supply voltage must be in
the range 18 to 36V DC.
4.
Perform offset compensation and calibration (ref. to chapter 4.5 to 4.9)
5.
If required, do additional settings (ref. to 8“ Parameterization over Operating
Panel”)
6.
Integration of amplifier in an Ethernet network and PLC (see chapters 5.3 and 6)
3.3
Installation and Wiring
Caution
In order to improve the natural convection and keep the temperature of the
amplifiers that are mounted in a cabinet, to a minimum, a distance of at least
15mm (0.6”) between the devices must be kept.