www.fmiproducts.com
116234-01L
20
CAUTION: Never touch the
blower wheel while in operation.
9. Check to make sure that power cord is
completely clear of blower wheel and
that there are no foreign objects in blower
wheel. Turn blower on and check for op
-
eration. Turn blower off by turning knob
fully counterclockwise before continuing.
10. Peel off backing paper and stick supplied
wiring diagram decal on firebox bottom
approximately 12" in front of blower (see
Figure 27).
Var
iabl
e
Fan
Sw
itch
W
hite
W
hite
Bla
ck
Gr
een
On
110
/11
5
V.A
.C.
Blo
we
r
Mo
tor
Bla
ck
Bla
ck
Bla
ck
Of
f
Figure 27 - Location of Wiring Diagram
Decal (Model May Vary From Illustration)
Wiring Diagram Decal
12" in Front of Blower
FIREPLACE INSTALLATION
Continued
Model BKT Installation
Note:
The BKT blower is for application into
direct-vent models only. When installing the
BKT thermostatically-controlled blower, you
must first secure the wiring connections from
the thermal switch to the blower (if it has not
already been factory installed)
.
1. Attach green ground wire from power cord
to blower housing using screw provided
(see Figure 28) Tighten screws securely
with a Phillips screwdriver.
2. Connect wire harness and power cord
terminals. Connect the jumper wire to
the blower motor terminal to the terminal
of the thermal switch. Connect one wire
of the thermal switch and one wire to the
other remaining blower motor terminal.
Note:
The power cord outer insulation sleeve
may have to be stripped slightly to allow
enough wire length to reach and make all
connections. DO NOT trim excessive length
away. Just enable enough to make all con
-
nections securely
.
3. Place the blower against the lower rear
wall of the firebox outer wrapper with
the exhaust port directed upward. Attach
Thermal disc magnetic bracket to the bot-
tom of the firebox sub-floor. The thermo
-
disc must be oriented near the fireplace
bottom as shown in Figure 6, in order to
sense temperature and properly operate.
The blower will be held in position against
the back wall by the magnets incorporated
onto the blower housing (see Figure 28).
4. Be certain that all wire terminals are
securely attached to terminals on blower
motor and that the screw retaining the
green ground wire is tight.
5. Mount speed control box against mount
-
ing plate provided in lower fireplace
cavity by placing plastic control shaft
forward through round hole (see Figure
26, page 19).
6. While supporting speed control, secure
control shaft with lock nut by pushing and
turning lock nut with pliers clockwise until
it is tight against mounting plate. Place
provided control knob on shaft (see Figure
26, page 19).
Figure 28 - Blower Model BKT
Thermodisc
Route BKT Blower
Through This Area
Side View Firebox Bottom
Ring Terminal
on Green Wire
Magnetic
Strips
Blower
Location
Magnets
Air Flow
Direction
Jumper
Wire
To Blower
Motor Terminal
Thermal
Disc
Magnetic
Bracket
Assembly
To
Thermal
Switch
Air Flow
Direction
Phillips
Screw
Power Cord