For more information, visit www.desatech.com

FLASHING INSTALLATION: (V6F-8DM or V12F-8DM) 

Determine the flashing to be used with the roof-opening chart.  
Slide flashing over pipe until base is flat against roof.  Replace 
as many shingles as needed to cover exposed area and flashing 
base.  Secure in position by nailing through shingles (see 
figure 14). 
DO NOT NAIL THROUGH FLASHING CONE. 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
INSTALLING FLASHING ON A METAL ROOF: 

When installing the flashing on a metal roof it is required that 
putty tape be used between the flashing and the roof.  The 
flashing must be secured to the roof using #8 x ¾” screws and 
then sealed with roof coating to prevent leakage through the 
screw holes.  A roof coating must also be applied around the 
perimeter of the flashing to provide a proper seal. 
 

STORM COLLAR INSTALLATION: (SC1 or SC2) 

Place storm collar over pipe and slide down until it is snug 
against the open edge of the flashing (see figure 15).  Use SC1 
for all round terminations and SC2 for all terminations with 
slip sections. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TERMINATIONS / SPARK ARRESTOR: 

The fireplace system must be terminated with the listed round 
top or chase terminations.  In any case, refer to the installation 
instructions supplied with the termination.  The terminations 
approved for this fireplace are the RT-8DM and RTL-8DM 

that can be used for flashing or chase and ET-8DM, ETO-
8DM, ETL-8DM and ETLO-8DM for chase style termination 
only.  Figure 16 shows an RTL-8DM round top termination. 

 
Terminations with 16” slip pipe sections are available.  The 
RTT-8DM and RTTL-8DM are approved for flashing 
installations. When needed, these adjustable terminations may 
be used in combination with the pipe assembly to achieve the 
correct chimney height. 

NOTE:

 In the rare instance there is a problem with side driven 

rain or wind or the chimney is not drafting properly, an ADS-
8DM Anti Draft Shield can be used with round terminations. 

 
CHASE INSTALLATIONS: 

Instructions for chase installations are included with the chase 
style termination chosen.  In a multiple chase installation, be 
sure to provide adequate distance between terminations to 
prevent smoke spillage from one termination to another.  We 
suggest that terminations be separated at least 24 inches, 
center to center and stacked at vertical height difference of 18 
inches (see figure 17). 

Figure 14 

 

Figure 15 

 

Figure 16 

CAUTION: 

Do not seal openings on the rooftop flashing. 

Follow the installation instructions provided with the 
termination being used. 

 

Figure 17 

Содержание Baja II 36WIL

Страница 1: ...pproved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard A DESA hood must be installed when using a vent free gas log heater see Accessories p 10 WARNING ALWAYS LEAVE GLASS DOORS FULLY OPENED OR FULLY CLOSED WHEN OPERATING THIS FIREPLACE SAVE THIS BOOK This book is valuable In addition to instructing you on how to install and m...

Страница 2: ...5 HEARTH EXTENSION PG 3 6 OUTSIDE AIR KIT INSTALLATION PG 4 7 FAN KIT ASSEMBLY PG 4 8 CHIMNEY PIPE INSTALLATION PG 4 5 6 9 TERMINATIONS PG 6 10 FINISHING YOUR FIREPLACE PG 7 11 MANTELS PG 7 12 GLASS DOORS PG 7 13 GAS LINE INSTALLATIONS PG 8 14 CHIMNEY OFFSET PG 9 15 DAMPER OPERATION PG 10 16 TECHNICAL SERVICE PG 10 17 REPLACEMENT PARTS AND ACCESORIES PG 11 ...

Страница 3: ...arances see page 7 Finishing your Fireplace Chimney Outer Pipe Surfaces 1 Min WARNING DO NOT PACK REQUIRED AIR SPACES WITH INSULATION OR OTHER MATERIALS MINIMUM MAXIMUM CHIMNEY HEIGHT The MINIMUM height of the chimney measured from the base of the fireplace to the flue gas outlet of the termination is 11 5 feet for straight flue or a flue with one elbow set The maximum distance between elbows is 2...

Страница 4: ...r of non combustible inorganic material having a thermal conductivity of K 0 84 BTU IN FT HR F or less at 1 thick For example if the material selected has a K factor of 0 25 such as glass fiber the following formula would apply 0 25 0 84 x 1 0 0 30 thickness required Thermal conductivity K of materials can be obtained from the manufacturer or supplier of the non combustible material If the hearth ...

Страница 5: ... flue pipe section with the hemmed end up Press down on each pipe section until the lances securely engage the hem on the fireplace starter The wire will assure the proper spacing between the inner and outer pipe sections Continue to assemble chimney sections as outlined above making sure that both the inner and outer pipe sections are locked together When installing double wall snap lock chimney ...

Страница 6: ...hich the pipe will penetrate the roof STEP 2 Determine the center point of the roof Pitch is the distance the floor drops over a given span usually 12 inches A 6 12 pitch means that the roof drops 6 inches for each 12 inches one measure horizontally down the roof STEP 3 Use the roof opening chart figure 13 below to determine the correct opening length and flashing required STEP 4 Remove the shingl...

Страница 7: ... any case refer to the installation instructions supplied with the termination The terminations approved for this fireplace are the RT 8DM and RTL 8DM that can be used for flashing or chase and ET 8DM ETO 8DM ETL 8DM and ETLO 8DM for chase style termination only Figure 16 shows an RTL 8DM round top termination Terminations with 16 slip pipe sections are available The RTT 8DM and RTTL 8DM are appro...

Страница 8: ... the fireplace The clearances from the side of the fireplace to any combustible material and wall should fall within the limits shown in figure 20 Example 1 figure 20 The face of a mantel bookshelf etc is made of combustible materials and protrudes 2 from the wall the fireplace is installed in This combustible material must be a minimum of 4 from the side of the fireplace opening Example 2 figure ...

Страница 9: ... gas line to wood framing to provide rigidity for threaded end STEP 4 Repack insulation around gas line and into sleeve opening Seal any gaps between gas line and refractory knockout hole with refractory cement or commercial furnace cement Install the gas appliance or cap off gas line if desired The gas pipe is intended for connection to an unvented vent free or a decorative gas appliance vented g...

Страница 10: ...to lock it in place see figure 24 FOR FURTHER OPERATING GUIDELINES INSTRUCTIONS AND WARRANTY INFORMATION PLEASE REFER TO YOUR HOMEOWNERS GUIDE OR CONTACT YOUR AUTHORIZED DEALER TECHNICAL SERVICE You may have further questions about installation operations or troubleshooting If so contact The Technical Service Department at 1 888 427 8322 When calling have the model number of the fireplace ready Fi...

Страница 11: ...For more information visit www desatech com 10 REPLACEMENT PARTS ACCESSORY PARTS ...

Отзывы: