![FLYSURFER PEAK5 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/flysurfer/peak5/peak5_user-manual_2312341018.webp)
EN
GL
ISH
18
AS
SE
M
BL
y
Of
TH
E B
-S
Af
E S
yS
TE
M
Unwind the 7 m B-Safe Line from the cardboard winder.
Connect the 7 m B-Safe Line with the end of the of the 10 m
B-Safe Line.
Attention,
all line connections must be tight!
Thread the B-Safe Lines with a total length of 17 m through
the ring of the Front Connection Line.
Attention:
the B-Safe Pigtail with the double loop knot should
not slip through the ring!
The CONNECT2 Control Bar is now B-Safe System ready and ope-
rates on 5 flying lines.
12.02 instalment of the B-Safe Top Lines
Take the cardboard winder with B-Safe Top Lines out of the
PEAK5 bag. Thread both B-Safe Top lines slowly through the loop
at the end of the B-Safe Line (5th line) of the CONNECT2 Control Bar.
Note:
A knot can be formed with the end of the B-Safe Line in
order to connect the B-Safe Top Lines with a Lark‘s Head. This
method is recommended if you want to fly several kites with
one control bar.
Unfold the PEAK5 on the ground in front of you. Start in the
middle of the PEAK and lift the A-Level on either side of the wing.
Tip:
Go beneath the A-Level and lift it above your head. Put it
on the shoulder which points toward the middle of the PEAK5.
The lines of the B-Safe System run through the rings integra-
ted into the B-Level ribs. Search for the red LCL (Little Connection
Line) and connect the B-Safe Top Line with a Lark‘s Head knot.
Disconnect the Pigtail of the second Front Line and thread it
slowly through the ring of the Front Connection Line.
Disconnect the second Front Line from the B-Safe Pigtail.
Connect the second Front Line with a Lark‘s Head below the
ring of the Front Connection Line. Tension both lines to tighten
the connection.
Connect the Front Pigtail of the second Front Line. Both Front
Lines are now ready.
Unwind both 5,1 m B-Safe Lines from the cardboard winder.
These lines are already connected and build one 10 m B-Safe
Line. Connect the B-Safe Pigtail and the 10 m B-Safe Line with
a double loop.
Note:
Leave the connection part where the 5,1 m B-
Safe Lines are connected to each other at the stan-
dard setting. The variable connection part can be
used to extend the total length of the B-Safe line af-
ter heavy use.
Содержание PEAK5
Страница 1: ...USER MANUAL PEAK5 EN...
Страница 6: ...ENGL ISH 6 Ov erv iew of the K i te 03 OVERVIEW OF THE KITE...