3
VIBRONET Installation 06.2016
Contents
Contents
Chapter 1: Introduction ............................................. 5
1.1 First steps ....................................................................... 5
1.2 Service addresses ............................................................ 5
1.3 About this manual .......................................................... 6
Chapter 2: Safety ....................................................... 7
2.1 Information for the operator ........................................... 7
2.2 Information for the installation personnel ....................... 8
2.3 Intended use .................................................................. 8
2.4 Residual risks and protective measures ............................ 9
2.5 EU conformity .............................................................. 10
Chapter 3: Technical data ......................................... 11
3.1 Hardware ..................................................................... 11
3.2 Dimensions ................................................................... 14
3.3. LED displays ................................................................. 16
Chapter 4: Installation .............................................. 17
4.1 Preparation ................................................................... 17
4.2 Installing sensors ......................................................... 19
Temperature probe - VIB 6.610 ...........................................................19
RPM sensor – VIB 6.620 / VIB 6.622 ....................................................20
4.3 Installing field multiplexers ............................................ 22
4.4 Installing the cabinet .................................................... 24
4.5 Electrical connection ..................................................... 25
Connecting sensors ............................................................................25
Connecting RPM sensor and temperature probe .................................27
Temperature probe with 3-lead or 4-lead connector ............................28
Connecting external process variables (I/U level) ..................................29
Connecting multiple MUXes to form a string line ................................30
Connecting a MUX string line to the basic unit ..................................31
Connecting the relay outputs ..............................................................32
Connecting a communication network ...............................................33
Connecting an external power supply .................................................35
Wiring diagram for VIBRONET Signalmaster cabinet ............................36