
Multifunction PV Analyzer
Test Setup
27
3. Connect the clamp to the circuit under test.
Tip: Push
to see a connection diagram.
The PV Analyzer automatically detects if the measurement is ac or dc current.
4. Push
to hold the measurement.
The measurement is on hold.
5. Push
to save the results to memory.
A confirmation message with ID number shows on the display and then returns to the test
screen.
Functional Tests
Checklist of functional tests.
To test:
1. Turn the rotary switch on the PV Analyzer to
FUNC./P
AC/DC
.
2. Push
to start to record the results of the functional tests.
3. Use
to highlight the different checklist items.
4. Push
and
to select pass, fail, or N/A for the highlighted row.
5. Push
(Back) to return to the Power test.
If any check boxes are filled in, then
is available. All results show on the display until you
clear for a new session regardless of power on/off or different day.
6. Push
to save the results to memory.
A confirmation message with ID number shows on the display and then returns to the test
screen.
Shop for Fluke products online at:
1.888.610.7664
www.
MyFlukeStore
.com