background image

 

Electrical Tester

 

 

Performance Tests

 

 

  

Testing the LEDs 

Use the following procedure to test the LEDs: 

Note 

The Tester must remain inactive for approximately 30 seconds before 

performing the following test. This will force a processor reset that will 

display all LCD segments for approximately 1 second at power up. 

1.

 

Short the test probes together. 

2.

 

Observe that all LEDs light (voltage range, hazard, volts ac and dc, and continuity). 

Testing the Backlight (T+ PRO) 

Use the following procedure to test the backlight: 

1.

 

Insert the test probes into a voltage source of  > 10 V ac or dc. 

2.

 

Observe that the backlight lights. 

Testing the Audible Signal 

Use the following procedure to test the audible signal: 

1.

 

Short the UUT test probes together. The beeper should sound.  

2.

 

If inactivated, press and hold 

 until you hear three beeps. 

Testing the Flashlight 

Use the following procedure to test the flashlight: 

1.

 

Press the UUT headlight button. 

2.

 

Observe that the flashlight turns on for approximately five seconds. 

Содержание EW-26046-44

Страница 1: ... Information A Warning identifies conditions and procedures that are dangerous to the user A Caution identifies conditions and procedures that can cause damage to the Product or the equipment under test XWWarning To avoid possible electric shock or personal injury follow these guidelines Use the Tester only as specified in this document otherwise the protection provided by the Tester may be impair...

Страница 2: ...n working in hazardous areas Use caution when working above 30 V ac rms 42 V peak or 60 V dc Such voltages pose a shock hazard When using probes keep fingers away from the probe tips Connect the common test lead before connecting the live test lead When disconnecting the test leads disconnect the live test lead first Do not operate the Tester with the battery door or portions of the cover removed ...

Страница 3: ...ive marking requirements The affixed label indicates that you must not discard this electrical electronic product in domestic household waste Product Category With reference to the equipment types in the WEEE Directive Annex I this product is classed as category 9 Monitoring and Control Instrumentation product Do not dispose of this product as unsorted municipal waste Contacting Fluke To contact F...

Страница 4: ... This will be displayed on the LED and LCD T PRO Duty Cycle Indefinitely for voltages up to 240 V For voltages between 240 V to 600 V the duty cycle is 30 s on 300 s off For voltages above 240 V the Tester must connect to a voltage source only for a MAXIMUM of 30 s and then disconnect for a MINIMUM of 300 s Voltage Hazard LED LEDs turn on voltages 30 V ac dc 35 LEDs LEDs turn on between 70 and 100...

Страница 5: ...ompartment Do not operate the Tester with the battery door or portions of the cover removed or loosened To replace the batteries do the following 1 Remove the battery door by using a flat blade screwdriver to turn the battery door fastener one quarter turn counterclockwise 2 Observing proper polarity replace the batteries with two new AAA alkaline batteries 3 Replace the battery door and secure it...

Страница 6: ...e the batteries WCaution Although the Tester may be used with depleted batteries replace depleted batteries immediately to avoid Tester damage from battery acid leakage To perform the self test short the two probes The self test lights all LEDs and all LCD segments T PRO The beeper sounds unless disabled and the Tester switches to continuity mode To complete the self test measure a known voltage b...

Страница 7: ...zard volts ac and dc and continuity Testing the Backlight T PRO Use the following procedure to test the backlight 1 Insert the test probes into a voltage source of 10 V ac or dc 2 Observe that the backlight lights Testing the Audible Signal Use the following procedure to test the audible signal 1 Short the UUT test probes together The beeper should sound 2 If inactivated press and hold until you h...

Страница 8: ...ge Measurement dc V 0 50 V 10 5 V 12 V LED On 10 1 to 10 9 6 10 5 V 12 V LED On 10 1 to 10 9 7 48 V LED On 12 48 V LED On Hazard On Beeper Vibration On 46 8 to 49 2 8 48 V LED On 12 48 V LED On Hazard On Beeper Vibration On 46 8 to 49 2 9 dc V 0 600 V 55 V LED On 12 48 V LED On Hazard On Beeper Vibration On 52 to 58 10 55 V LED On 12 48 V LED On Hazard On Beeper Vibration On 52 to 58 11 590 V LED ...

Страница 9: ...47 V Canada 347 V 347 V LED On 20 480 V 480 V 480 V LED On 21 Continuity 0 20 kΩ Short Continuity LED On Continuity Sign 22 Resistance 0 00 9 99 kΩ Short None 0 00 to 0 03 23 100 Ω None 0 06 to 0 14 24 9 kΩ None 8 52 to 9 48 Load Current Test To test the load current set up the UUT with equipment as shown in Figure 2 and complete the following procedure 1 Set the DMM to the mA dc function 2 Apply ...

Страница 10: ...nt as shown in Figure 2 and complete the following procedure Note When you press the GFCI pushbutton the resulting test will last for up to seven seconds 1 Set the DMM to the mA ac function 2 Apply 100 V 60 Hz from the Source The DMM reading should light the 12 48 V LEDs and Hazard symbol 3 Press the UUT GFCI pushbutton for one second The UUT DC and DC LEDs should alternately switch on and off whi...

Страница 11: ...urchase price free of charge repair or replacement of a defective product which is returned to a Fluke authorized service center within the warranty period To obtain warranty service contact your nearest Fluke authorized service center to obtain return authorization information then send the product to that service center with a description of the difficulty postage and insurance prepaid FOB Desti...

Страница 12: ...T and T PRO Calibration Information 12 ...

Отзывы: