5.3.1
Installation On A Wood Floor
The wood floor installation kit includes lag bolts. Drill three 1/8 inch x 1 inch
deep (approximately 3 mm x 25.5 mm) pilot holes using the bracket to mark
the hole placement. Use the lag bolts to install the bracket to the floor. Ensure
that the bracket is installed in such a way as to ensure the bath will have a mini-
mum 6 inches of clearance for air circulation. (See Figure 2). Screw the bracket
securely to the floor.
5.3.2
Installation On A Concrete Floor
Using a concrete drill and concrete drill bit, drill three 1/4 inch x 1 1/4 inch
deep (approximately 6.5 mm x 32 mm) holes in the concrete floor using the
bracket to mark the hole placement. Drop the flare anchor bolt into the hole.
Tightening the screw expands the anchor in the drilled hole and secures the
bracket. Ensure that the bracket is installed in such a way as to ensure the bath
will have a minimum of 6 inches of clearance for air circulation. (See Figure
2). Screw the bracket securely to the floor.
5.3.3
Installation Of The Bath
Slide the back casters of the bath completely into the bracket caster slots (see
Figure 2). Lock the front casters of the bath. Check that the bath is securely
locked into the bracket by gently pushing on the bath. Proceed to fill the bath
with the applicable bath fluid after reading the entire User’s Guide.
6331 Calibration Bath
User’s Guide
18
Front
Caster Slots
8.5" (21.6
cm)
Wall
Figure 2
Tipping Prevention Bracket Installation