Fluidwell F133-P Скачать руководство пользователя страница 15

 

FW_F133P_v1702_02_EN 

Page 15 

3.1.5. 

EXPLANATION OF SETUP MENU 5 - FLOWMETER 

SIGNAL 
51 

With this setting the type of flowmeter output is selected. The settings with 
LP (low-pass) filter are used to apply a build-in noise reduction. 

Selections "active pulse" offer a detection level of 50% of the supply 
voltage. 

TYPE OF SIGNAL

 

EXPLANATION

 

RESISTANCE

 

FREQ

.

 

/

 M

REMARK

 

NPN 

NPN input 

100 kΩ pull-up 

max.6 kHz. 

(open collector) 

NPN - LP 

NPN with low pass filter 

100 kΩ pull-up 

max.1.2 kHz.  

(open collector) 

less sensitive 

REED 

Reed-switch input 

1 MΩ pull-up 

max.1.2 kHz. 

 

REED - LP 

Reed-with low pass filter 

1 MΩ pull-up 

max.120 Hz. 

Less sensitive 

PNP 

PNP input 

100K pull-down 

max.6 kHz. 

 

PNP - LP 

PNP with low pass filter 

100K pull-down 

max.1.2 kHz. 

Less sensitive 

NAMUR 

NAMUR input 

820 Ω pull-down 

max.4 kHz. 

External power 

required 

COIL-HI 

High sensitive coil input 

min. 20 mV

pp

 

Sensitive for 

interference! 

COIL-HI (option ZF) 

min. 10 mV

pp

 

COIL-HI (option ZG) 

min. 5 mV

pp

 

COIL LO 

Low sensitive coil input 

min. 80 mV

pp

 

Normal 

sensitivity 

8-1 DC 

Active pulse input 

detection level 8.2V DC 

3K9 

max.10KHz. 

External power 

required 

12 DC 

Active pulse input 

detection level 12V DC 

4K 

max.10KHz. 

External power 

required 

24 DC 

Active pulse input 

detection level 24V DC 

3K 

max.10KHz. 

External power 

required 

3.1.6. 

EXPLANATION OF SETUP MENU 6 - CONTROL 

Two open-collector outputs (Optional: mechanic relays or active outputs) are available to control 
relays or small valves (max. 50VDC 

– 300mA). It is advised to use relay one for pump-start and 

relay two for the valve control. 

DELAY TIME 
61 

This is the time between the moment of a start-signal and the moment before 
relay 2 will be switched on. In the mean time, relay 1 will be switched to 
control e.g. a pump. With time 0.0 seconds, this function is disabled.

 

BEGIN TIME 
62 

After the delay-time (61), relay 2 will be switched-on as well. and the 
“begin-time” becomes valid. The unit has to receive about twice the 
number of pulses as programmed with setting 26, before “start-up time” 
(setup 63) becomes valid.  
If not enough pulses have been received within this time, the delivery will 
be cancelled. With time 0.0 seconds, this function is disabled. 

START-UP TIME 
63 

Now, the start-up time allows the system to become operational without 
having a low-flow rate alarm. After this time, the system will become full 
operational. With time 0.0 seconds, this function is disabled.  

NO PULSE TIME 
64 

As soon as the unit is full operational, the flow can be monitored. The 
F133-P will switch-off relay 1 and 2 (or relay 2 only: see setting 65/66) as 
soon as during X-seconds no pulses have been received from the 
flowmeter. In most cases, this is “end of process” (see 65).  
With time 0.0 seconds, this function is disabled.  

PAUSE 
65 

With this function, a “pause-function” can be enabled: if during the 
process “stop” will be pressed, or the process is interrupted for another 
reason like “no pulse time”, “flow rate alarm” or with the “status input”, the 
batch will be stopped but can be resumed. If the unit comes in “PAUSE”, 
relay 2 will be switched-off but relay 1 (pump control) remains energized.  
Applications where this function is useful is delivery of sub-batches for 
example where you want to have one “overall” total.  

RESTART TIME 
66 

Following setup 65, the F133-P allows the Operator to restart a delivery 
within X-seconds. If this does not happen within this time, the delivery will 
be finished completely. With time 0.0 seconds, this function is disabled. 

Содержание F133-P

Страница 1: ...l input flowmeter pulse Namur and coil Status inputs start and stop Control outputs two pump valve control outputs Options Intrinsically Safe Modbus communication and backlight F Series Field mounted...

Страница 2: ...FW_F133P_v1702_02_EN Page 2...

Страница 3: ...the general waste system or into a landfill At the end of its life equipment shall be disposed of according to the local regulations regarding waste of the electrical and the electronic equipment Plea...

Страница 4: ...133 P or connected instruments A caution indicates actions or procedures which if not performed correctly may lead to personal injury or incorrect functioning of the F133 P or connected instruments A...

Страница 5: ...lanation of Setup menu 8 Communication option 16 3 1 9 Explanation of Setup menu 9 Others 17 4 Installation 17 4 1 General directions 17 4 2 Installation surrounding conditions 17 4 3 Dimensions Enclo...

Страница 6: ...3 P To power the sensor several options are available Standard outputs Two transistor or relay option outputs to control a pump and a valve All kind of switch conditions can be set to optimize the pro...

Страница 7: ...he STOP key is also used to select the batch total the batch counter the total and the accumulated total The STOP key is also used to select a digit or an option after the PROG ENTER key has been pres...

Страница 8: ...signal continuously even when no process is running The value for Total can be initialized To do so be sure Total is shown First press PROG followed by STOP After pressing PROG the text PUSH STOP is s...

Страница 9: ...ed to start a new delivery the F133 P will reset itself B Delay time for the pump to start up C Begin pump is at delivery speed D Startup valve opens to build up the flow flow detection is active E St...

Страница 10: ...n influence on the operation It is possible to prevent access to the setup menu with a password A password may be required to enter the setup menu Without this password access is denied 3 1 HOW TO PRO...

Страница 11: ...nd the setting UNIT When you do not want to save the change wait for approximately 20 seconds or press and hold the PROG ENTER key for approximately 3 seconds Action Result Remark 1 Momentarily press...

Страница 12: ...ds 3 3 DISPLAY 31 light 0 off 20 40 60 80 100 full brightness 32 BL alarm off on flash 4 POWER MANAGEMENT 41 LCD new fast 1 sec 3 sec 15 sec 30 sec off 42 battery mode operational shelf 5 FLOWMETER 51...

Страница 13: ...is not recalculated For future reference best practice is to make a note of the accumulated total before you program the recalculated K Factor DECIMALS K FACTOR 14 This setting is used to set the amou...

Страница 14: ...l valid after the delay time an alarm is given 3 1 3 EXPLANATION OF SETUP MENU 3 DISPLAY LIGHT 33 The backlight brightness can be adjusted from 0 off to 100 full brightness in steps of 20 When the F13...

Страница 15: ...nt before relay 2 will be switched on In the mean time relay 1 will be switched to control e g a pump With time 0 0 seconds this function is disabled BEGIN TIME 62 After the delay time 61 relay 2 will...

Страница 16: ...ion safety To maintain a secure operation automation and control it is the sole responsibility of the owner to install and manage the appropriate safety measures to protect the network the product and...

Страница 17: ...al before carrying out its instructions This device may only be operated by persons who are authorized and trained by the operator of the facility All instructions in this manual are to be observed Ma...

Страница 18: ...mm 30mm M20 x 1 5 M16 x 1 5 M16 x 1 5 30mm 30mm M20 x 1 5 M20 x 1 5 M20 x 1 5 25mm 25mm 1 2 NPT 0 9 3x 1 2 NPT 0 12 0 12 HA HM HN HO HP HT HU 6 x M12 12mm 12mm 24mm 24mm 36mm 36mm 14mm 17mm 115 mm 4 5...

Страница 19: ...mm 2 36 120 mm 4 72 HD HK HK back box flat bottom HE HF HG HH D 12mm 12mm 12mm 24mm 24mm 36mm 36mm 14mm 17mm 22 5mm 30mm 30mm D 16mm D 20mm 0 9 D 22mm 0 866 22 5mm 25mm 25mm D 20mm D 20mm D 16mm HC 7...

Страница 20: ...h PE stud which is installed in the metal back panel The metal front panel is connected to the Protective Earth by the mounting screws and serrated washers For V AC applications the terminal 00 shall...

Страница 21: ...h the cover to the back panel Type PM 110 230V AC The PE connection in the metal back panel is made with a serrated washer a terminal a washer and a screw The PE connection to the metal cover is made...

Страница 22: ...LOSURE The PE connection The F133 P in a GRP enclosure meets the requirements of class 2 double insulated Therefore the incoming PE wire is terminated with an insulating end cap Type PM 110 230V AC Ty...

Страница 23: ...luence the battery life time It is strongly advised to use a zero power pickup such as a coil or reed switch when operating without external power It is possible to use some low power NPN or PNP outpu...

Страница 24: ...oil 1 2V DC 1mA Reed 3V DC 1mA ext on on off on off off 8 2V DC 8Vin AC 10Vin DC 12V DC 10Vin AC 14Vin DC 24V DC 18Vin AC 26Vin DC Type PF Power supply in 15 24V AC 20 30V DC Switch location typical S...

Страница 25: ...according to the functions R1 and R2 is available with this option Max driving capacity 50mA 24V per output Requires power supply type PD PF PM Fig 12 Terminal connections Active output typical Option...

Страница 26: ...3 P is suitable for use with flowmeters which have a coil output signal Two sensitivity levels can be selected COIL LO sensitivity from about 80mVpp COIL HI sensitivity from about 20mVpp type ZF COIL...

Страница 27: ...on level of 50 of the supply voltage please refer to active signals Fig 16 Terminal connections PNP signal input typical Active signal 8 2V 12V and 24V If a sensor gives an active signal read chapter...

Страница 28: ...ction the batch controller can be started and or stopped The function of the input is described in paragraph 3 2 3 7 STATUS The input must be switched with a potential free contact to the GND terminal...

Страница 29: ...e RS232 communication option terminal 27 is used for supplying the interface Please connect the DTR or the RTS signal of the interface to this terminal and set it active 12V If no active signal is ava...

Страница 30: ...used and correctly installed For enclosures and windows with a high surface resistance potential charging hazard exists Do not rub these surfaces of the indicator Clean window and enclosure only with...

Страница 31: ...llowing conditions The indicator is either supplied by the internal supply option PC the external supply connected to terminals 0 and 1 option PD the circuit supply connected to terminals 7 and 8 opti...

Страница 32: ...ected The sensor supply voltage is fixed 8 2V DC Set the sensor supply 1 Make the F133 P safe If applicable mind the battery power 2 Open the F133 P and carefully remove the cable connectors and the p...

Страница 33: ..._F133P_v1702_02_EN Page 33 5 3 CONFIGURATION EXAMPLES INTRINSICALLY SAFE APPLICATIONS Fig 26 F133 P CT OT PC PX XI Battery powered IIB IIC IIIC Fig 27 F133 P CT OT PX XI Basic power supply IIB IIC III...

Страница 34: ...FW_F133P_v1702_02_EN Page 34 Fig 28 F133 P CT OT PD XI External power supply IIB IIC IIIC Fig 29 F133 P CT OT PX XI Basic power supply IIB IIC IIIC...

Страница 35: ...e utmost care to prevent a short circuit and damage 4 Do not recharge crush disassemble incinerate heat above its rated temperature or expose the contents to water 5 Dispose of the battery in accordan...

Страница 36: ...P inputs consume more energy than coil inputs Input frequency the higher the frequency the shorter the battery life time Display update fast display update uses significantly more power Pulse output a...

Страница 37: ...ng 2x PG9 1x M20 Drilling 2x NPT Drilling 2x M16 1x M20 Drilling 1x M20 Drilling 2x M20 Drilling 6x M12 Drilling 1x NPT Drilling 3x NPT Drilling 4x M20 No drilling No drilling Drilling 2x 16mm 0 63 1x...

Страница 38: ...irectives and Standards EMC EN 61326 1 FCC 47 CFR part 15 LVD EN IEC 61010 1 ATEX IECEx EN IEC 60079 0 EN IEC 60079 11 RoHS EN 50581 IP NEMA EN 60529 NEMA 250 Flowmeter Type P npn npn lp reed reed lp...

Страница 39: ...ted total and accumulated total Total Digits 7 digits Units L m3 GAL USGAL kg lb bbl no unit Decimals 0000000 111111 1 22222 22 3333 333 Note total can be reset to zero Accumulated total Digits 11 dig...

Страница 40: ...the K Factor and time unit correct The unit has to count the number of pulses according to setup 26 within the time according to setup 27 Make sure setup 27is set to 10 0 seconds for example the resul...

Страница 41: ...General Modbus Communication Protocol and Modbus troubleshooting guide that are available through our website or your distributor Runtime variables PDU ADDRESS REGISTER VARIABLE NO REGISTERS R W TYPE...

Страница 42: ...40052 K factor 2 r w uint32 1 9999999 Representation 0 000010 9999999 depending on variable decimals K factor d 54 h 0x036 40055 decimals K factor 1 r w uint16 0 6 d 55 h 0x037 40056 calculation 1 r w...

Страница 43: ...200HP 6 38400HP d 145 h 0x091 40146 Modbus address 1 r w uint16 1 247 d 146 h 0x092 40147 Modbus mode 1 r w uint16 0 OFF 1 RTU 2 ASCII d 1271 h 0x4F7 41272 databits 1 r w uint16 0 8 bits 1 7 bits d 12...

Страница 44: ...FW_F133P_v1702_02_EN Page 44 APPENDIX D DECLARATION OF CONFORMITY...

Страница 45: ...external start stop 17 Flowmeter input 27 flowrate alarm 9 calculation 15 Installation 18 Intrinsic safety 31 Intrinsically Safe options 33 IP classification 18 maintenance 37 model 18 NAMUR signal 29...

Страница 46: ...Fig 15 Terminal connections NPN signal input typical 26 Fig 16 Terminal connections PNP signal input typical 27 Fig 17 Terminal connections Active signal input typical 27 Fig 18 Terminal connections...

Страница 47: ...te alarm 0 0 L min 2A alarm delay time 0 0 sec 3 DISPLAY 31 light 100 32 bl alarm off 4 POWER MANAGEMENT 41 LCD new 1 sec 42 mode operational 5 FLOWMETER 51 signal coil lo 6 CONTROL 61 delay time 0 0...

Страница 48: ...Fluidwell B V PO box 6 Voltaweg 23 Website www fluidwell com 5460 AA Veghel 5466 AZ Veghel Find your nearest representative www fluidwell com representatives the Netherlands the Netherlands 2017 Fluid...

Отзывы: