3
Box Contents E820/E920
1x Seat and base
1x Right crank pedal
1x Fill funnel/hose
Hex Key
Telescoping tube at-
tachment bolts/spring
washers
Mainframe bolts
E820 fixed crank arm
Frame bolt washers
2x Mainframe Nylock nut
1x Multi-tool
1x Main frame w/
telescoping tube and
internal gas assist
shock
3x Frame levelers
(E-920 only) Adjustable crank arm kit in-
cludes 2x 300mm aluminum crank arms,
2x 10mm L-pins, and separately installed
left/right pedals.
Note the E-820 uses standard fixed length
crank arms as pictured in the mainframe
drawing above.
E-920 Adjustable
crank arm kit
Содержание E820 Fitness UBE
Страница 19: ...20 FDF 9B Tank Assembly 70321 13205 Tank Cover Assem bly 20301 Tank Back Assem bly...
Страница 20: ...21 Flywheel Assembly...
Страница 21: ...22 13205 Tank Cover Assembly 13045 13045...
Страница 22: ...23 20301 Tank Back Assembly...