
MAINTENANCE INSTRUCTIONS
58
Primary heat exchanger
(see fig. 1)
•
Close the shut-off valves and drain the central
heating circuit of the water heater;
•
Switch off the power and gas supply to the water
heater;
•
Remove and dismantle the entire burner unit
(see
6.6.1 “Cleaning the condensation module and
burner unit”);
•
Remove the gas valve;
•
Remove the spring and then the condensate
drainpipe;
•
Remove the fixing springs and then the delivery
and return pipes;
•
Remove the support brackets and pull out the heat
exchanger;
•
Remove the regulation sensor from the old heat
exchanger and refit it together with the two
condensate drainpipes to the new one;
•
Replace the heat exchanger and re-assemble the
components following the above procedure in
reverse order;
•
Switch on the electricity, water and gas supplies
and fill the system with water. Check for any leaks
from the joints and bleed off any air from the
circuit. Restart the water heater, making sure that
there are no gas leaks;
primary heat
exchanger
flue connection
chamber
stainless steel
pipe coil
ceramic fibre
washer
Fig. 1
Содержание FLOWMAX-120
Страница 2: ......
Страница 9: ...GENERAL INFORMATION 5...
Страница 10: ...GENERAL INFORMATION 6...
Страница 11: ...GENERAL INFORMATION 7...
Страница 12: ...GENERAL INFORMATION 8...
Страница 26: ...INSTALLATION INSTRUCTIONS 22 3 6 Schematic of Piping Installation...
Страница 27: ...INSTALLATION INSTRUCTIONS 23...
Страница 34: ...INSTALLATION INSTRUCTIONS 30...
Страница 35: ...INSTALLATION INSTRUCTIONS 31...
Страница 36: ...INSTALLATION INSTRUCTIONS 32...
Страница 37: ...INSTALLATION INSTRUCTIONS 33...
Страница 38: ...INSTALLATION INSTRUCTIONS 34...
Страница 72: ...FLOW CHART 68...
Страница 73: ...FLOW CHART 69...
Страница 74: ...FLOW CHART 70...
Страница 75: ...FLOW CHART 71...
Страница 76: ...FLOW CHART 72...
Страница 77: ...FLOW CHART 73...
Страница 78: ...FLOW CHART 74...
Страница 79: ...FLOW CHART 75...
Страница 80: ...FLOW CHART 76...
Страница 87: ......