
LI5X Process & Temperature Meter Instruction Manual
43
Programming the Meter (
prog
)
It is
very important
to read the following information, before proceeding
to program the meter:
•
There is
no need to recalibrate
the meter when first received from
the factory.
•
The meter is
factory calibrated
prior to shipment, for all input
types, in milliamps, volts, and degrees respectively. The calibration
equipment is certified to NIST standards.
•
Use the
Scale
menu to scale process inputs (e.g. 4-20 mA). A cali-
brated signal source is not needed to scale the meter.
•
For thermocouple and RTDs, just connect the sensor to the proper
terminals and turn the power on.
No calibration needed!
(when
the meter is first received from the factory).
The
Program
menu contains the
Calibrate
and the
Scale
menus.
Process inputs may be calibrated or scaled to any display within the
range of the meter.
prog
ScAl
CAL
Additional parameters, not needed for most applications, are pro-
grammed with the
Advanced
features menu, see
Advanced Features
Menu
, page 50.
Spec Tech Industrial Electric
www.spectechind.com
888-773-2832
Spec Tech Industrial Electric
www.spectechind.com
888-773-2832