Boost Pump Control
When the pump is first installed or high-pressure tubing
is replaced, you must purge the system by sending pres-
surized water through it. Touch the
[I]
button while the
pump is off to energize the boost pump and purge the
system.
Note
: The operator must
block
the bleed-down to
drain so the water can flow through the high-pressure
tubing, then open the bleed-down to drain when purging
is finished so the pump can operate normally.
Turn off the purge system by touching the
[O]
button,
by cycling power to the system, or by starting the pump.
Navigation
•
Touch the
Main Run Screen
button to return to the
Main Run Screen
•
Touch the
Display Services
button to continue to
the
Display Services
screen
24 | M-390
© Flow International Corporation
HYPERJET™ 94i-S AND 94i-D PUMPS
Содержание 94i-D
Страница 1: ...HYPERJET 94i S 94i D M 390 REV C APRIL 2010 ...
Страница 6: ...Notes 6 M 390 Flow International Corporation HYPERJET 94i S AND 94i D PUMPS ...
Страница 20: ...Notes 20 M 390 Flow International Corporation HYPERJET 94i S AND 94i D PUMPS ...
Страница 30: ...Notes 30 M 390 Flow International Corporation HYPERJET 94i S AND 94i D PUMPS ...
Страница 40: ...Notes 40 M 390 Flow International Corporation HYPERJET 94i S AND 94i D PUMPS ...
Страница 75: ...CHAPTER 7 Customer Support MS 2266 Customer Support Flow International Corporation M 390 75 ...
Страница 76: ...Notes 76 M 390 Flow International Corporation HYPERJET 94i S AND 94i D PUMPS ...