1. Start-up / Operation
Ensure you have primed the pump correctly. (Instructions on priming the pump
can be found in the installation section under Point 8. Priming Pump).
The MM Series pump is not self-priming and must be primed prior to use.
The AJ Series pumps are self priming therefore it is possible to start them
without filing the suction pipe with water. However it is still necessary to fill the
pump body. The priming operation requires a few minutes and it may also be
necessary to fill the pump body with water several times (accordingly to length
and diameter of the suction pipe).
Note: If the pump is not used for a long period of time, repeat the priming
procedure before start up.
Start the pump and check rotation of the motor. It rotates in a clockwise direction
when viewing the fan through the cowl behind the motor.
2. Protection switch
The AJ & MM Series of pumps have a built in thermal protection switch. The
pumps stops if an overload condition occurs. The motor restarts atomatically
after it has cooled down (see point 3 on trouble shooting section for information