The place of installation should be as dry as possible and protected from environmental influences.
E
LECTRICAL
C
ONNECTIONS
L
OAD
C
ELL
C
ABLE
C
ONNECTION
First losen the cable gland. Then insert the load cell cable through the cable gland until the shrink tube fully
disappears in the box. The wires should be below the printed circuit board and pulled back to the top at the
upper end of the printed circuit board. Finally, connect the cables to the clamping terminals as indicated
below:
Function
Terminal designation
Sig +
Signal
Sig -
Exci
Exc +
Sense + *
Sen + *
Excitation
Exc -
Sense *
Sen - *
* if load cell is equiped with 6-wire conductor cable
After all conductors have been clamped to the terminals, the cable glands must be tightened. Please verify
that all cable glands are tight and the cable is fully stress relieved.
The connection sequence of the load cells should correspond to the corners of the scale, i.e
Corner 1 = Load cell/Sensor 1, Corner 2 = Load cell/Sensor 2, etc.