61
USER MANUAL - WebdynEasy LoRaWAN
Version 0.10
/upload/data/method
Data file management
communication protocol
List:
•
none
•
ftp
•
ws
ftp
ws
/upload/data/format
Data file format for data
List:
•
xml
xml
/upload/data/schedule
Schedule identifier for sending
data
Integer (min 1 max
65535)
/upload/commun/size_limit
Maximum non compressed data
file size in Mb
Integer (min 0 max 30)
10
/alarm/sources/modem_ip
Modem IP address change alarm
configuration
List:
•
on
•
off
•
delayed
off
/alarm/sources/msisdn
SIM card change alarm
configuration
-
on: enabled and immediate
send
-
off: disabled
delayed: enabled and send at
next connection
List:
•
on
•
off
•
delayed
off
/alarm/sources/sw_version
Software update alarm
configuration (firmware or core)
-
on: enabled and immediate
send
-
off: disabled
delayed: enabled and send at
next connection
List:
•
on
•
off
•
delayed
on
/alarm/sources/defaults/ignored
List of fault to ignore:
•
D_MODEM
•
D_MODEM_SIM_MISS
•
D_MODEM_SIM_CODE_FAIL
•
D_MODEM_PUK
•
D_MODEM_REG_DENIED
Text (fault list separated
by a comma “,”)
/alarm/sources/defaults/delayed
List of faults that cannot be sent
immediately but only at the next
connection:
•
D_MODEM
•
D_MODEM_SIM_MISS
•
D_MODEM_SIM_CODE_FAIL
•
D_MODEM_PUK
•
D_MODEM_REG_DENIED
Text (fault list separated
by a comma “,”)
/scheduler/schedules/schedule/
Schedule list
/scheduler/schedules/schedule/id
Schedule identifier
Whole number (min 1
max 2,147,483,647)
/scheduler/schedules/schedule/label
Schedule name
Text
/scheduler/schedules/schedule/type
Schedule type
List:
•
Daily
•
Weekly
•
Monthly
•
Yearly
•
Follower
Daily
/scheduler/schedules/schedule/parent
Parent schedule identifier for a
“follower” type schedule
Integer (min 1 max
65535)
/scheduler/schedules/schedule/start/time
Trigger time for the first schedule
iteration for a “daily”, “weekly”
or “monthly” type schedule
Time format:
"hh:mm:ss"
/scheduler/schedules/schedule/start/datetime
Trigger date and time for the first
schedule iteration for a “yearly”
type schedule
Date and time format:
“year-mm-
ddThh:mm:ss"
/scheduler/schedules/schedule/start/dayofweek
Trigger day in the week for the
first schedule iteration for a
“weekly” type schedule
List:
•
Monday
•
Tuesday
•
Wednesday
•
Thursday
•
Friday
•
Saturday
•
Sunday